1.
Discussion on Decision of Base Building Project Plan in thermal Power Plant;
火电基本建设项目开工排序决策探讨
2.
Single Machine Scheduling Under job Processing time is a Linear Deterioration of its Start time
工件加工时间是开工时间线性函数的单机排序问题
3.
Single Machine Scheduling with Precedence Constraints and Processing Time Dependent on Starting Time;
具有优先约束和加工时间依赖开工时间的单机排序问题
4.
2 Activity Sequencing-identifying and documenting interactivity dependencies.
工序排序-确定工序之间的依赖关系,并形成文件。
5.
Activity Sequencing- identifying and documenting interactivity dependencies.
工序排序-定工序之间的依赖关系,并形成文件。
6.
On the PivotTable or PivotChart toolbar, click Sort Ascending or Sort Descending.
在“数据透视表”或“数据透视图”工具栏上,单击“升序排序”或“降序排序”。
7.
Research on m*n Different Ordinal Scheduling Algorithm;
m*n不同顺序工件排序算法的研究
8.
Minimizing the Number of Tardy Jobs with a Subset T of the Jobs to Be Sure on Time
部分工件必须不误工的误工排序问题
9.
Scheduling Models with Jobs' Processing Times Being Nonconstant;
工件加工时间非恒定的排序模型研究
10.
To order by repeated splitting and merging.
通过反复多次分开和合并进行排序。
11.
To sequence by repeated splitting and merging.
用反复分开和合并的方法进行的排序。
12.
The Study of Flow-line Two-stage Production Schedules with Infinite Optimal Solutions;
有多重最优解的流水型两工序排序问题研究
13.
it was a bewildering array of books; his tools were in an orderly array on the basement wall.
工具井然有序地靠墙排列着。
14.
He figured out his program for the day to a nicety.
他已经巧妙地排下了一天的工作程序。
15.
The Study of Process Scheduling Method in CAPP Expert System;
CAPP专家系统工艺排序方法的研究
16.
On-line Parallel Machine Scheduling with Special Jobs to Minimize the Makespan;
具有特殊工件的平行机在线排序问题
17.
Jobs Scheduling with Delivery Time on A Single Batch Machine;
工件带运输时间的单机分批排序问题
18.
Network Flow Model for Fixed Job Scheduling Problem;
固定工件排序问题的网络流模型研究