1.
Research on Retrofit Technique of Hydraulic Turbine Based on Numerical Test;
基于数值试验的水轮机改造技术的研究
2.
Brief discussion of speed-governing system reconstruction for hydraulic turbine
水电站水轮机调速系统改造技术分析
3.
Technological Transformation on Thrust Bearing Shed Oil of Hydrogenerator;
水轮发电机推力轴承甩油的技术改造
4.
The Research of Rehabilitating and Enhancing for Hydroelectric Set in Liujiaxia Hydropower Plant;
刘家峡水电厂水轮发电机组增容改造分析研究
5.
The Retrofitting of Turbine Drainage System of Feed Pump for Huadian Tieling Power Plant
华电铁岭发电公司给水泵汽轮机疏水系统改造
6.
Reconstruction of automatic component of water impeller power generator set for Lianhua hydraulic power plant
莲花水电厂水轮发电机组自动化元器件改造
7.
Change the Rubber Bearing into the Oil Bearing and Performance Analysis of It to the Small Turbine;
小型水轮机橡胶轴承改造为油轴承及性能分析
8.
The Technique of Reformation and Regulating of Steam Turbine-Low Vacuum-Circulating Water Heat-supply;
汽轮机低真空循环水供暖改造和调试技术
9.
Performance Analysis and Technical Transformation of Tubular Turbine
轴伸贯流式水轮机性能分析与技术改造
10.
Force Characteristic Test Technology and Application on Capacity-plus Transformation of Hydroelectric Generating Set
水轮发电机组增容改造力特性测试技术及应用
11.
The Reformation of the Steam Turbine to Low Vacuum-Circulating Water Heat-supply of Baogang thermal plant
汽轮发电机低真空循环水供暖系统的改造
12.
Application of REXA Actuator in MEH Retrofit for Feed Pump Turbines
REXA执行器在给水泵汽轮机MEH改造中的应用
13.
Energy Conservation Technology Reformation for Turbine Drived Boiler Feed Water Pump in Heat/Power Co-generation
热功联产汽轮机拖动锅炉给水泵节能技术改造
14.
Research on the Way to Change Water-lubrication Rubber Bearing into Oil-lubrication Bearing in Hydraulic Turbine
水轮机橡胶轴承改造为油轴承的途径研究
15.
upgrading of old turbine-generation sets
老式汽轮机组的改造
16.
Hydraulic Turbine Model Acceptance Test of No.2 Unit of Xinanjiang Hydropower Station
新安江水电厂2#机增容改造水轮机模型验收试验
17.
Technical Transformation to Working Seal of Turbine Main Shaft for 1# Unit of Xijin Hydropower Plant
西津水电厂1号机组水轮机主轴工作密封的技术改造
18.
A capacity? increasing transformation is needed to improve the output of No.2 water turbine in Fengshuba Hydropower Plant.
为了提高枫树坝水电厂2号水轮机出力,需要对水轮机进行增容改造。