1.
Dynamic experiment,modeling and compensation of bar-shaped strain gauge balance for wind tunnel
杆式风洞应变天平动态实验、建模与补偿
2.
Design and Analysis on General Project and Key Parts of Low-speed Wind Tunnel Strain-gauge Balance Static Calibration System
低速风洞应变天平校准系统总体方案及关键部件设计与分析
3.
It should be noted that a balance is not always required in a wind tunnel.
应该指出,天平对风洞来说并非是绝对必须的。
4.
Although strain gage balances have been most useful in transonic and supersonic tunnels, they are by no means excluded from lowspeed work.
虽然,应变天平最适用于跨超音速风洞,但丝毫不意味着不能用于低速实验。
5.
Design Theory and Application of Parallel Wind Tunnel Balance Based on Stewart Platform;
基于Stewart平台的并联风洞天平设计理论及应用研究
6.
A Wind Tunnel Simulation on Mean Flow Variances over Transverse Dunes
横向沙丘气流平均速度变化规律的风洞模拟
7.
Only a minimum of strut is exposed to the airstream, the remainder being shielded by fairings not attached to the balance.
天平支杆只有很小一部分暴露在风洞气流中,而其余部分都用和天平不相连的风挡罩起来。
8.
Wind pressure distribution characteristics and interference effects on long span roof of a typical gymnasium
典型体育馆屋盖表面平均风压特性及干扰效应风洞试验研究
9.
Excavation Analysis and Research to Underground Caves;
平面应变和三维方法分析洞室开挖问题的探讨
10.
A few balances mounted above the tunnel support the model in an inverted position for "normal" running.
有少数天平安装在风洞上面,把模型支在倒装位置上进行“正常”的试验。
11.
Wind tunnel force balance test and wind-induced responses of the Guangzhou New TV Tower structure Ⅰ:wind tunnel test
广州新电视塔模型测力风洞试验及风致响应研究Ⅰ:风洞试验
12.
Numerical Simulation and Wind Tunnel Tests of Wind Loads Acting on HYSY-981 Semi-submersible Platform
HYSY-981半潜式平台风载荷数值模拟与风洞实验
13.
This paper discussed the origin and the basic concepts ofthe wind tunnel data base, which is applied in space shuttle research anddevelopment.
本文讨论了风洞数据库的由来和基本概念以及在航天飞机研制中的应用。
14.
The Development and Application Study of a New Strain Gage Balance Calibration System in Earth Coordinate System;
新型应变天平地轴系校准系统研制与应用研究
15.
Study on Wind Loads and Wind-induced Vibration of the Jin Mao Building Using High-frequency-force-balance Method
用高频动态天平方法研究金茂大厦的动力风荷载和风振响应
16.
Wavelength and Height of Aeolian Ripple in a Wind Tunnel
风成沙纹发育过程中形态变化的风洞实验研究
17.
If no remedial measures are taken, the upper layer grottoes are bound to become open-air.
如不加强治理,上层洞窟终将变成露天。
18.
full scale wind tunnel
整车风洞或全尺寸风洞