说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 三峡永久船闸
1.
MONITORING ANALYSIS ON PRESTRESS STATE OF ANCHOR CABLE OF HIGH SLOPE OF THE TGP PERMANENT SHIPLOCKS
三峡永久船闸高边坡锚索预应力状态监测分析
2.
On the lining concrete design age of TGP permanent shiplocks
三峡永久船闸衬砌混凝土设计龄期探讨
3.
Study on Safety Monitoring Data Management System During Construction of TGP Permanent Lock
三峡永久船闸施工期安全监测数据管理系统
4.
Excavation Displacement Analysis by Distinct Element Method in Three Gorges Project;
三峡永久船闸高边坡开挖变形的离散元法分析
5.
The Lined Wall Design and Inspects of Three Gorges Permanent Navigation Lock;
三峡永久船闸砼衬砌墙结构设计与监测
6.
Study on Concrete Quality Control in the Floor the Three Structure of Gorges Project s Permanent Ship-locks;
三峡永久船闸地面工程混凝土质量控制与研究
7.
Study of strength and stability for the chamber wall and the slope of the permanent lock in Three Gorges project
三峡永久船闸闸室墙及边坡的强度与稳定性研究
8.
Study on the Numerical Simulation of Deformation Mechanism of Middle Frusta and Vertical Border Wall at TGP Permanent Shiplock;
三峡永久船闸中隔墩和闸室直立边墙变形机理的数值研究
9.
Based on the deformation rating method, this paper discusses the study of deformation monitoring control indices for the Three Gorges Permanent Ship Lock Slope.
本文采用变形速率法,对三峡永久船闸变形监控指标进行探索。
10.
Application of two kinds of special mend materials in the treatment of the internal bug of the concreteof Three Gorges permanent ship lock
两种特殊修补材料在三峡永久船闸混凝土内部缺陷处理中的应用
11.
The Fault Diagnosis of the Slope of the Permanent Ship Lock for the Three Gorges--Acoustic Emission Signal Analysis and Processing Research;
长江三峡永久船闸边坡故障诊断——声发射信号分析处理研究
12.
Piezometric Tube Level Observation and Seepage Analysis of Permanent Shiplocks Project in the Three Gorges;
三峡永久船闸高边坡测压管水位观测与渗流分析
13.
Research and application on prestressed anchorage techniques of high slopes for Three Gorges permanent shiplocks
三峡永久船闸高边坡预应力锚固技术的研究与应用
14.
By comparison analysis and construction feedback, it verified the effect of stabilization measures and demonstrated that the ship lock slope is stable as a whole.
通过比较分析和施工反馈的结果,证明了加固的效果,说明了三峡永久船闸体整体是稳定的。
15.
Hydralics monitored findings in the water-pumping debugging period for TGP lock are presented and compared with model test data.
介绍了三峡永久船闸抽水调试阶段水力学监测的部分成果,并与模型值进行了比较。
16.
Monitoring analysis on the seepage at curtain zone in permanent ship lock of TGP
三峡工程永久船闸帷幕区渗流监测分析
17.
Design of system Anchor rods for TGP permanent shiplock high slope
三峡工程永久船闸高边坡系统锚杆动态设计
18.
Evaluation and Analysis on High Side Slope Stability of Permanent Ship Brake in Three Gorges Project;
三峡工程永久船闸高边坡稳定性的评价与分析