说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 张拉锚固
1.
Research and Application of Tension and Anchor System of Prestressed Steel Bar
预应力钢棒张拉锚固体系的研究及工程应用
2.
Prestressed Concrete Box Girder Segmental Anchoring Tensioned Floor Surface Analysis and Processing of Longitudinal Cracks
预应力砼箱梁节段张拉锚固面底板纵向裂缝分析与处理
3.
The cable is then tensioned and anchored at the ends.
然后将钢索张拉并锚固于端头处。
4.
Experimental Analysis of Pre-stress Loss on Tensioning and Anchoring CFRP Sheet with Wave-shaped-gear
波形齿体系张拉并锚固CFRP片材的预应力损失
5.
Study on Tensioning Test of Circular Prestressed Strand in Plane Pylon Anchorage Area of Cable-stayed Bridge
斜拉桥索塔锚固区环向预应力束的张拉试验研究
6.
MODEL TESTING RESEARCH ON THE VARIATION OF TENSION FORCE OF ANCHOR CABLE WITH TIME IN REINFORCEMENT OF SOFT ROCKS
软岩加固中锚索张拉吨位随时间变化规律的模型试验研究
7.
Strut-and-tie Model Method for Bursting Force Calculation of Post-tensioned Anchorage Zone in Rectangular Beam
矩形截面梁后张锚固区劈裂力计算的拉压杆模型法
8.
Local Analysis under the Cable Anchorage of Tower Wall for the Cable-Stayed Bridge;
斜拉桥主塔拉索锚固区锚下局部受力分析
9.
Model Test on the Cable-beam Anchorage Structure with Tensile Anchor Plate of Cable-stayed Bridges
斜拉桥锚拉板式的锚固结构模型试验与研究
10.
Local Stress Analysis of Anchorage Zones of Qin Bridge
琴桥桥塔拉索锚下锚固区局部应力分析
11.
Study on the Reasonable Pattern of Cable-Girder Anchorage for Steel Cable-Stayed Bridge
钢斜拉桥锚箱式索梁锚固区合理构造型式研究
12.
ANALYSIS OF GROUP EFFECT IN THE DESIGN OF POST-INSTALLED ANCHORS SUBJECTED TO TENSILE LOADING
基于群锚效应的后锚固受拉计算方法分析
13.
Anchoring capacity of tensile rock bolt in ultimate limit state
极限状态下岩体受拉锚杆锚固承载力的计算
14.
An Analysis Method of the Whole Working Course for the Force Transferring Mechanism in Fixed Segment of Tensile-type Anchor Bar
拉力型锚杆锚固段传力机理的全过程分析方法
15.
Calculation Method of Anchoring Segment Length of Cable
拉力型锚索锚固段长度的一种确定方法
16.
Field Tests on the Anchor Effect of Pressure and Tensile Anchor Cable Structures
压力型和拉力型锚索锚固作用的原位试验研究
17.
Optimization Analysis of Hanger Tensioning Process on Self-anchored Suspension Bridges
自锚式悬索桥吊索张拉过程优化分析
18.
Research on hanger installation analysis and construction management for self-anchored suspension bridge
自锚式悬索桥吊索张拉施工控制分析