1.
Safety Monitoring Renovation and Deformation Law Analysis for Gezhouba Third Ship Lock
葛洲坝3号船闸安全监测更新改造及变形规律初步分析
2.
Finite Element Analysis of Stoplog of Navigation Lock No.2 for Gezhouba Hydraulic Project
葛洲坝水利枢纽二号船闸叠梁门有限元分析
3.
The lock keeper closed the lock gate.
船闸管理员关上了闸门。
4.
Liner 105 departs at 3:20 p.m., and sails direct.
105 号轮下午 3:20 开船,中途不停。
5.
Describing of the Handling Process and Brief Analyzing of the Cause of Tripping about the Third Transformer Starting in the Second Substation
二降压3号主变压器启动送电后跳闸故障原因及处理过程浅析
6.
The Fault Diagnosis of the Slope of the Permanent Ship Lock for the Three Gorges--Acoustic Emission Signal Analysis and Processing Research;
长江三峡永久船闸边坡故障诊断——声发射信号分析处理研究
7.
Analysis and Treatment of Worn Sluice Service Valve Slot of 1# Ship Lock at Changzhou Hydraulic Complex
长洲1号船闸泄水工作阀门槽磨损分析处理探讨
8.
Finite Element Analysis on the Emergency Gate of No.2 Navigation Lock of Gezhouba Water Conservancy Project
葛洲坝水利枢纽二号船闸事故检修门有限元分析
9.
Estimation and analysis on delays at busy waterway lock
繁忙船闸的船舶待闸时间分析与估算
10.
Analysis of pivot bolt breaking for water gate of Xinqiao ship lock
新桥船闸闸门支铰连接螺栓断裂分析
11.
Space Finite Analysis of Sector Lock Gate Structure;
船闸三角闸门结构的空间有限元分析
12.
filling and emptying system
(船闸的) 充水和放水系统
13.
lock filling and emptying system
船闸充水与泄水系统
14.
Our ship locked into the canal.
我们的船过闸驶入运河。
15.
New Method Study of Sites Vicarious Calibration for SZ-3/CMODIS
神舟3号飞船中分辨率成像光谱仪场地替代定标新方法研究
16.
Application of Strengthened Anchor Cable in Gate Monoliths of Permanent Navigation Lock
加固锚索在永久船闸闸首支持体中的运用
17.
Research on Freight Demand and Lock Capacity of the Three Gorges;
长江三峡船闸过闸需求与通过能力研究
18.
Energy dissipation effect and mechanism of open ditch energy dissipater in high-head lock
高水头船闸闸室明沟消能效果及机理分析