1.
Construction Technology and Quality Control of Baoding No.1 Surface Water Treatment Plant
保定市第一地表水厂施工技术及质量控制
2.
The precipitation bailing planning of circulation water system construction of Wangtan electric power plant
王滩电厂循环水系统施工降排水方案
3.
The technology of the pipe jacking construction applied in Langshan water plant expansion project in Nantong
南通狼山水厂扩建工程顶管施工技术
4.
Common fault analysis on construction quality of BOP workshop fire water system in nuclear power plant
核电厂BOP厂房消防水系统施工质量通病分析
5.
Construction Numerical Simulation of Cavern Group in Underground Hydropower House;
水电站地下厂房洞室群施工数值仿真
6.
Concrete construction techniques for Three Gorges underground power hause
三峡水电站地下厂房混凝土施工技术
7.
Construction Techniques of Rockbolting Beam in Underground Powerhouse at Baoxing Hydropower Station
宝兴水电站地下厂房岩锚梁施工技术
8.
The Method of Hunting for Grounwater and Constructing a Supply Well in the Chengxi Water Plant of Datian County,Fujian Province
福建大田城西水厂供水井找水及施工方法
9.
Improved Design of Carrying Project Control Method at Changqing Water and Power Supply Department;
长庆水电厂工程施工质量控制方案改进设计
10.
Construction technology of mass fair-faced concrete of steam turbine foundation in power plant
某电厂汽机基础大体积清水混凝土施工工艺
11.
Summary on the construction of sealing the roof of powerhouse of Fengtan hydropower station expansion works
风滩水电站扩建工程发电厂房封顶施工综述
12.
Analysis and Discussion on Construction Technology and Crack Control Measures of Rectangular Concrete Water Tank in A Waterworks
水厂矩形水池混凝土施工技术及裂缝控制措施分析探讨
13.
Associated with the running and management of power facilities just like water, electric, air, warm.
熟悉工厂的水电气暖等动力设施的运营及管理。
14.
Construction of Chemical Water Treatment System of Khartoum Refinery in Sudan
苏丹喀土穆炼油厂化水系统配合施工总结
15.
Ablation treatment and anchorage cable construction of underground building in Suofengying water power station
索风营水电站地下厂房溶蚀带处理及锚索施工
16.
The Study on Construction Control as well as the Geological Disaster Evaluation of Mine Geology Disaster of Emei Cement Plant;
峨眉水泥厂矿山地质灾害评价与施工控制研究
17.
Nuozhadu Underground Powerhouse Cavern Group Study of Rational Sequence Constructiong;
糯扎渡水电站地下厂房洞室群施工顺序研究
18.
The Research of Key Construction Technique on Underground House of a Hydroelectric Plant;
溪洛渡水电站地下厂房施工关键技术研究