1.
The floodgate walls act as concrete projects of big volume subjected to hostile environments, such as high temperature and high dampness and pose a high anti-seeping and anti-leaking demand.
水闸墙体为高温高湿环境下的大体积混凝土工程,防渗、防漏要求高。
2.
Study on filling and emptying system of Guiping second-line shiplock chamber wall structure
桂平二线船闸输水系统与闸室墙结构方案研究
3.
Study of strength and stability for the chamber wall and the slope of the permanent lock in Three Gorges project
三峡永久船闸闸室墙及边坡的强度与稳定性研究
4.
Study on the Numerical Simulation of Deformation Mechanism of Middle Frusta and Vertical Border Wall at TGP Permanent Shiplock;
三峡永久船闸中隔墩和闸室直立边墙变形机理的数值研究
5.
Intrusion detection system is called the second strobe of security.
入侵检测系统是防火墙之后的第二道安全闸门。
6.
He steered toward it, thinking, I must remember to put the brake on before I hit the wall.
他照直开去,心想:可别忘了拉闸,以免撞墙。
7.
Analysis for hazard of crack lying in parapet of a water gate and its treatments
总干闸胸墙裂缝危害性及处理措施分析
8.
The Application of the Caisson in the XingZha Flood Control Project;
沉井岸墙结构在新闸防洪控制工程中的应用
9.
The Lined Wall Design and Inspects of Three Gorges Permanent Navigation Lock;
三峡永久船闸砼衬砌墙结构设计与监测
10.
Sliding Cause Analysis of the Berth Band Slippage in SaJi Lock′s Lead Ship Canal;
沙集船闸上游引航道驳岸墙破坏原因分析
11.
The Application of Jet Grouting Impervious Wall in Shiplock Project of Hydropower Station
高压旋喷防渗墙在水电站船闸工程中的应用
12.
Through improvement of construction technology of chamfer of Zaohe River Third-line Lock's chamber wall, the inclined surface concrete quality has been well controlled.
通过对皂河三线船闸闸室墙倒角施工工艺的改进,斜面砼表面质量得到了较好的控制。
13.
Research of Sluice Overall Structure Design s Method and Application of Empty Box Type Soil Baffle;
水闸整体结构设计方法研究及空箱挡土墙的应用
14.
Application of seepage wall formed by multi-head and small-diameter mixing piles in deeper sluice project
多头深层搅拌桩截渗墙在涡阳枢纽深孔闸工程中的应用
15.
The application of three hose high pressure swing spray in the vertical cut-off wall of the reconstruction of jinji sluice dam of Quanzhou
三管高压摆喷在泉州金鸡拦河闸重建工程垂直防渗墙中的应用
16.
The lock keeper closed the lock gate.
船闸管理员关上了闸门。
17.
head gate structure [irrigation]
渠首闸门,总水闸门[灌溉]
18.
Piers and Bottom Board Temperature Control Design of Gate Piers and Bottom Board of Spillway Water Gates for Yanshan Reservoir
燕山水库溢洪道水闸闸墩和闸底板温控设计