说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 泵站工程
1.
Research on the Optimization of C25 Concrete Mix Proportion of Pump Station Engineering
泵站工程C25混凝土配合比优化研究
2.
Application of high performance concrete pumping construction in east pumping station project in Bostan Lake
高性能混凝土泵送施工在博斯腾湖东泵站工程中的应用
3.
Application of precipitation by wellpoint to deep foundation construction of pumping station
井点降水在泵站工程基坑开挖施工中的应用
4.
Familiar with pump structure designing, installing and debugging, especially in large-size or slurry pump design.
3熟悉泵及泵站工程的设计安装与调试,特别是大型泵或渣浆泵的技术设计。
5.
Architectural & Landscape Design for the Huinanzhuang Pumping Station of the Middle Route Project for South-to-North Water Transfer
南水北调中线惠南庄泵站工程建筑及景观设计
6.
Application of high pressure jet grouting pile anti-seepage wall to rainfall pumping station
旋喷桩防渗墙在阜阳路雨水泵站工程中的应用
7.
Deep Foundation Pit Supporting Project of Large Drainage Pumping Station in Wuhan
武汉某大型排水泵站深基坑支护工程
8.
Study on Control Method for Prevention from Concrete Crack Based on Concrete Pumping Construction of the Pumping Station of Wannian Sluice of the South-to-North Water Diversion Project
南水北调工程山东万年闸泵站泵送混凝土施工防裂方法研究
9.
In the light of characteristics of south-to-north water transfer project in the east of China, the requirements of step pump stations of the project for pump units are analyzed.
针对南水北调东线工程特点,分析了其梯级泵站对主泵机组的要求。
10.
Model Acceptance Test of the Baoying Pumping Station in the South-to-North Water Project
南水北调东线一期工程宝应泵站水泵装置模型验收试验成果分析
11.
Differences between Reactor Coolant Pumps Used in Qinshan Phase II NPP Project and Daya Bay NPP
秦山核电二期工程主泵与大亚湾核电站主泵的差异及其影响
12.
Compilation of Pump Procurement Bidding Documents of the Baoying Pumping Station in East Route Project of South-to-North Water Diversion;
南水北调东线工程宝应泵站水泵采购招标文件编写中的有关问题
13.
The Acceptance Test of the Model Pump Systerm of Linjiaba Pumping Station in the Eastern Route First-stage Project of the South-to-North Water Transfer Project
南水北调东线一期工程蔺家坝泵站水泵模型装置验收试验
14.
Design Charactristics of Diversion Pump Station of Water Supply and Envioronment project for Changchun City
长春市供水与环境工程引水部分泵站设计特点
15.
Several Problems about Step Pump Stations in Eastern Route South-to-North Water Transfer Project
南水北调东线工程梯级泵站的几个问题
16.
Study on Source Pump Station Optimal Operation of the First-stage Project of Eastern Route of South-to-North Water Transfer;
南水北调东线一期工程源头泵站优化运行研究
17.
Study on Optimal Multi-stage Pumping Operation Models in Large-Scale Water Transfer Project;
大型引水工程梯级泵站优化调度模型研究
18.
Computer Monitoring and Control System for the First-stage Water Diversion Pumping Station in Zhoushan Mainland
舟山大陆引水一期工程泵站计算机监控系统