说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 水厂扩建工程
1.
The technology of the pipe jacking construction applied in Langshan water plant expansion project in Nantong
南通狼山水厂扩建工程顶管施工技术
2.
Extended Project Design of Jishu Paotaishan Waterworks
舒兰市吉舒炮台山水厂扩建工程设计
3.
Problems and Solutions for Expansion Project of Third Waterworks in Jilin City
吉林市第三供水厂扩建工程存在的问题及解决对策
4.
Summary on the construction of sealing the roof of powerhouse of Fengtan hydropower station expansion works
风滩水电站扩建工程发电厂房封顶施工综述
5.
Concrete quality analysis of second period of extension project in Shaoxing Sewage Treatment Plant
绍兴污水处理厂二期扩建工程混凝土质量分析
6.
Rebuilding and Extension Engineering of Refinery Wastewater Workshop of Daqing Petrochemical Company
大庆石化公司炼油废水厂改扩建工程实例
7.
The Applications of Columnar Powerhouse in the Extension Project of the Hydropower Station
圆筒式厂房在水电站扩建工程中的应用
8.
Integration Method of Automation Control Systems in Rebuilding/Extension Projects of Waterworks
水厂改扩建工程自动化控制系统的整合方法
9.
ALTERNATIVE PROPOSAL OF THERMAL DISCHARGE FOR THE SECOND STAGE EXPANSION PROJECT OF HUANENG POWER PLANT IN RIZHAO
华能日照电厂二期扩建工程温排水排水方案优选
10.
The Bent-frame Construction Scheme of Upstream Hoist of Factory Workshop in the Extension Project of Yanzhou Hydropower Station,Lixian County,Hunan Province
湖南澧县艳洲水电站扩机土建工程厂房上游启闭机排架施工方案
11.
Simulation Study on Temperature Control and Crack Prevention during Construction of Cylindrical Powerhouse for Expansion Project of Dahua Hydropower Station
大化水电站扩建工程圆筒式厂房施工期温控防裂仿真研究
12.
Research of Flood Influence for the Extension Project of Ash-crossing Bridge of Sichuan Bashu Jiangyou;
四川巴蜀江油电厂灰管桥扩建工程洪水影响研究
13.
Numerical Model of Thermal Discharge from Laibin Power Plant Based on Mike21FM
基于Mike21FM的来宾电厂扩建工程温排水数值模拟研究
14.
The Project Research of WISCO Silicon-steel Plant's Alteration and Continuation;
武钢硅钢厂改扩建工程投资项目研究
15.
Hazard Identification and Management in Power Plant s Expanding Construction;
火电厂扩建工程危害辨识与管理研究
16.
Study on the Cost Management in the Second Expansion Project of Power Plant of Tieling;
铁岭电厂二期扩建工程费用管理研究
17.
STRUCTURAL DESIGN FOR EXTENSION OF A PROJECT DIVISION A AND B IN ZH ANGZHOU
漳州某工程A-B区扩建厂房结构设计
18.
Shuangyushu Heating Plant will be expanded and Caoqiao Gas-Fired Cogeneration Plant built.
完成双榆树供热厂扩建工程及草桥燃气热电厂新建工程。