说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 顶桩
1.
The Study of Application of Bulkhead Structure of Battle and Sheet Pipe Pile Foundation under High Reclamation;
高填土斜顶桩板桩承台驳岸结构应用技术研究
2.
Analysis on pile-soil interaction of inclined pile bulkhead structure using ANSYS
采用ANSYS分析斜顶桩驳岸结构的桩土相互作用
3.
Study on Pile-Soil Interaction of Inclined-Pile Bulkhead Structure in the Deep Water High-Pile Wharf;
深水高桩码头斜顶桩驳岸结构桩土相互作用研究
4.
Study on Pile-Soil Interaction Under High-Filling Behind Inclined Pile Bulkhead in Deep Water Port
深水港斜顶桩驳岸结构后高回填桩土相互作用研究
5.
"They're like wild horses; they won't stay tied up in a stable.
“拴马桩也不顶事了。”
6.
Research on the Method of Measuring Large Diameter Pile Bearing Capacity by Self-Balance System with Loading on Pile Top;
大直径桩承载力桩顶加载自锚式测试方法研究
7.
Prevention Measures on Not Enough Concrete Strength of the Top Drilling and Pouring Stake;
钻孔灌注桩桩顶混凝土强度不足的预防措施
8.
Fuzzy Reliability Analysis of Stability of Karst Roof under Pile Tip
基桩桩端岩溶顶板稳定性模糊可靠性分析
9.
Methods of Reducing Deck Horizontal Displacement of Single-pile Offshore Platform
减小独立桩桩顶平台水平位移方法探讨
10.
Calculation of Pile-soil Stress Ratio of Rigid Pile Composite Foundation with Consideration of Piles upward Puncture Deformation
考虑桩顶刺入变形的刚性桩复合地基桩土应力比计算
11.
I taper the end of the fence post with an ax
我用斧头将篱笆桩顶端削尖
12.
I tapered the end of the fence post with an ax.
我用斧头将篱笆桩顶端削尖。
13.
Application of Perloading Piles in Rectifying Deviation of a Six-storey Residential Building
预压托换桩在楼房顶升纠偏中的应用
14.
Study on the Counterforce on the Pile Head and the Sedimentation Characteristics of Piled Raft Foundation and Balance Design Method for Variable-Rigidity;
桩筏基础桩顶反力及沉降特性研究与变刚度调平设计
15.
A Probe into the Control of Hyper-pouring Quantity of Bored Concrete Pilety;
泥浆护壁正反循环灌注桩桩顶超灌高度控制的探讨
16.
Mechanism of settlement control of piled raft with gap or compressible block at pile top for support of railway embankment
桩顶预留净空或可压缩垫块的桩承式路堤沉降控制机理研究
17.
FUZZY POSSIBILISTIC RELIABILITY ANALYSIS METHOD FOR STABILITY OF KARST ROOF UNDER PILE TIP
基桩桩端岩溶顶板稳定性模糊能度可靠性分析方法
18.
On height computation method of pile type bridge pier and ribbed plate type abutment post
桩柱式桥墩、肋板式桥台柱顶高程计算方法