1.
R&D and production of the overhead conductors for the Three Gorges project and their promotion to the technical development in the wire and cable industry
三峡工程用架空导线研制与生产及对线缆行业技术进步的推动
2.
Construction of Three Gorge Power Transmission Project Promotes Technical Advance of Overhead Cable Line in China
三峡输电工程建设极大促进我国架空线缆技术进步
3.
Model study and prototype application of diversion outlet design for Three Gorges project
三峡工程导流底孔水力学研究与运用
4.
Application of GPS technology to open-wise transmission line
GPS技术在架空送电线路工程中的应用
5.
A Study on the Tourism Spatial Structure of the Three Gorges Region Influenced by the Construction of the Three Gorges Engineering;
三峡工程影响下三峡区域旅游地空间结构研究
6.
Influence of the Three Gorges Project on Evolution of the Yangtze Three Gorges Tourism Layout and Countermeasures;
三峡工程对长江三峡旅游空间格局的影响
7.
Analysis of Ampere Force in Three-phase Conducting Wires of Overhead Transmission Line
架空输电线路三相导线间安培力分析
8.
Research on the Spatial-temporal Process of Land Use/Cover Change in Reservoir Area During the Ten Years of Three Gorges Project s Constructing--A Case Study of Kaixian;
三峡工程实施十年间库区土地利用/覆被时空变化研究——以开县为例
9.
A NEW LOW-ENERGY FUSE DETONATING SYSTEM AND ITS APPLICATION IN SAN GORGE WORK
新型低能导爆索起爆系统及其在三峡工程中的应用
10.
The Economic Analysis of Using Composite Insulators on the EHV Transmission Line of Three Gorges Project
合成绝缘子用于三峡工程超高压输电线路的技术经济分析
11.
Analysis on regulation role of TGP in "07.7" flood of the Yangtze River
三峡工程对“07.7”洪水调度的作用分析
12.
Application of plastic concrete in TGP
塑性混凝土在三峡工程中的应用研究
13.
Experimental study and prototype verification on surface spillway cavitation of Three Gorges project
三峡工程表孔空化问题试验研究与原型验证
14.
Three Gorges Right Bank First-stage River Diversion Concrete Dam Body Joint Grouting
三峡右岸一期导流工程混凝土坝体接缝灌浆
15.
when the project is completed,
在三峡工程完全竣工前,
16.
Study on Nonlinear Prediction for Reservoir Bank Collapse in Fuling Area of the Three Gorges Project;
三峡工程涪陵区水库塌岸非线性预测研究
17.
Improvement of Lightning Protection Engineering on 6kV Overhead Power Line
6kV架空电力线路的防雷工程改造
18.
Checking Method and Forestland-used Characteristics Exploration to Engineering Construction of Overhead Power Circuit;
架空电力线路工程建设使用林地特点及核查方法探讨