1.
Piers and Bottom Board Temperature Control Design of Gate Piers and Bottom Board of Spillway Water Gates for Yanshan Reservoir
燕山水库溢洪道水闸闸墩和闸底板温控设计
2.
Application on Disposing of Settlement Joint of Pier with Chemical Grouting in Shaping Water Gate
化学灌浆在沙坪水闸闸墩沉降缝处理中的应用
3.
Quantitative Analysis of the Main Factors of Vertical Concrete Cracks in Some Sluice Pier in the Northern Jiangsu Plain
苏北平原某水闸闸墩混凝土开裂主导因素的定量分析
4.
Design of Pre-stressed Pier for Sluice Gate in Third Cascade of Baishuijiang Power Station
白水江三级水电站泄洪闸预应力闸墩设计
5.
The Study of Prestressed Anchor Funicular Applied in Pier Works of Xiao Xia Hydroelectric Power Station;
预应力锚索在小峡水电站闸墩中的应用研究
6.
Effect of Cooling Pipe Measure on Temperature Control and Anti-cracking of Concrete Pier
混凝土闸墩施工期冷却水管温控防裂效果分析
7.
Force State Investigation about Prestressed Pier model of Pushi River Pumped Storage Power Station
蒲石河水库预应力闸墩模型受力状态研究
8.
The Design of the Spillway Crest Outlet Pre-stressed Gate Pier Structure of Jufudu Hydropower Project
居甫渡水电站溢流表孔预应力闸墩结构设计
9.
Comparison on the Schemes of the Neck Position Slotting of Pre-stressed Pier of Pankou Hydropower Station
潘口水电站预应力闸墩颈部开槽方案研究
10.
Prestressing Tendon Construction for Spillway Weir Piers in Guazhi Hydroplant
挂治水电站溢流坝闸墩预应力锚索施工
11.
Structure recheck and reinforcement of pier of spillway tunnel of Lishimen reservoir
里石门水库泄洪孔闸墩结构复核及加固
12.
Influences of Water-Seal Position on Pier Stress of Concrete Gravity Dam
混凝土重力坝止水位置对闸墩应力的影响研究
13.
Effect of United Casting Height of Gate Pier and Bottom Plate on Gate Pier Crack Control
闸墩与底板连浇高度对闸墩防裂效果的影响
14.
head gate structure [irrigation]
渠首闸门,总水闸门[灌溉]
15.
Construction Temperature Observation and Back Analysis of Pier-wall C25 Concrete for Caojie Sluice
草街冲砂闸闸墩C25混凝土施工温度观测反分析
16.
Study on model test for a large scale prestressed pier of a flood releasing and scouring sluice
大型泄洪排沙闸预应力闸墩结构模型试验研究
17.
Analysis and Treatment of Cracking Along Water Current Direction on the Double-hole Water-conveyance Tunnel in Ship Lock of Three-Gorge Project;
三峡船闸中隔墩输水隧洞顺流向裂缝分析与处理
18.
Study on Formation Causes of Pier Cracks and Rehabilitation Procedures for FENGMAN Dam;
丰满水电站溢流坝闸墩裂缝成因分析及其加固技术研究