说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 深水航道治理工程
1.
Improvement Project of Deep-Draft Channel of Yangtze Estuary
长江口深水航道治理工程的设计与施工
2.
Analysis of the Economic Benefit of Yangtze Estuary Deepwater Channel Regulation Project;
长江口深水航道治理工程的经济效益分析
3.
Study and practice of comprehensive utilization of dredging soil of the Yangtze Estuary Deepwater Channel Engineering
长江口深水航道治理工程疏浚土综合利用
4.
Research of Engineering GIS and the application in the regulation of YRE;
工程地理信息系统及其在长江口深水航道治理工程中的应用
5.
Formation of Bagged Sand Dike Core and Placing of Sand Cushion
长江口深水航道治理工程袋装砂堤心成型及砂被铺设施工工艺
6.
Bagged Sand Core Sloping Dike Structure and Its Design Method in Yangtze Estuary Deepwater Channel Regulation Project
长江口深水航道治理工程中袋装砂堤心斜坡堤结构设计
7.
Application of new type hollow-block mound breakwater in the Yangtze Estuary deepwater channel regulation project
新型空心方块斜坡堤结构在长江口深水航道治理工程中的应用
8.
Design of the Sloping-Faced North Leading Dike With Bagged-Sand Core for the Yangtze Estuary Deepwater Channel Regulation PhaseⅠProject
长江口深水航道治理工程一期工程北导堤袋装砂堤心斜坡堤的设计
9.
Semi-circular composite dikes are one of the main structures in Yangtze Estuary Channel Regulation Project.
半圆体混合堤是长江口深水航道治理工程中堤坝主要结构型式之一。
10.
Design and construction of the 1st & 2nd phase regulation projects of Yangtze Estuary Deepwater Channel
长江口深水航道治理一、二期工程的设计与施工
11.
The first phase of the project to improve the deepwater channel at the mouth of the Yangtze River has been completed, recording a new draught of 8.5 meters.
长江口深水航道整治一期工程已经完成,水深达到8.5米。
12.
The design and construction of the sloping- faced north leading dike with bagged- sand core for the 1st phase of the Yangtze Estuary deepwater channel regulation project are introduced.
介绍长江口深水航道治理一期工程北导堤袋装砂堤心斜坡堤的设计与施工。
13.
Change of re-siltation in the Yangtze Estuary deepwater channel during 1~(st) and 2~(nd) stages
长江口深水航道(一、二期工程)回淤变化
14.
The detection of gushing water in deep wells and the research of engineering government
深井巷道涌水探查方法及工程治理研究
15.
Yangtze Estuary Deepwater Channel Scientific Experiment Centre Phase I Project;
长江口深水航道科学试验中心一期工程
16.
Research of the Changing Process and Regulation on the Upstream and Downstream Waterway of TGP before and after Reservoir Impounding;
三峡工程蓄水前后上下游航道演变及治理措施研究
17.
(1) Constructing water projects or regulating rivers and navigation waterways without authorization;
(一)擅自修建水工程或者整治河道、航道的;
18.
The Research on Numerical Simulation of Flow Field for Regulation Engineering in Wuqiao Waterway
武桥水道航道整治工程流场数值模拟试验研究