说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 衬砌方案
1.
In the past, Magnesia-Alumina-Spinel bricks were considered as state of the art for chrome-free kiln linings in the cement industry.
过去,在水泥行业中,镁铝尖晶石砖被认为是最先进的无铬衬砌方案
2.
Researches on the Special Scheme for Canal Liners with Rolled Waterproof Pad in Seasonal Frozen Regions
季节冻土区防水卷材防渗渠道的特种衬砌方案研究
3.
Reliable Design Method of Tunnel Lings in Soft Soil
软土隧道衬砌结构的可靠性设计方法
4.
Study on Action Mechanism and Design Methodology of Tunnel Single Shell Lining;
隧道单层衬砌作用机理及设计方法研究
5.
Study on the Design Philosophy of Prestressed Concrete Linings for Shield Tunnel;
盾构法隧道预应力衬砌设计理论及方法研究
6.
Study on Methods for Crack Prevention of Mechanized Continuously-constructed Concrete Liner;
机械化连续施工混凝土衬砌防裂方法研究
7.
Research on Internal Forces Computational Methods for DOT Shield-Driven Tunnel Lining;
双圆盾构隧道衬砌结构内力计算方法研究
8.
Assessment on the Safety of Tunnel Lining Structures under Construction;
施工期隧道衬砌结构安全性评价方法研究
9.
Analysis Method on Excavation and Lining Structure for Large-span Tailrace Bifurcation Tunnel
大跨径尾水岔洞开挖与衬砌稳定分析方法研究
10.
Research on the Design Methods of Composite Tunnel Lining on Consideration of Environmental Effect
考虑环境作用的复合式衬砌结构设计方法探讨
11.
The Fuzzy Comprehensive Evaluation of Defect Degree of Road Tunnel Lining
公路隧道衬砌病害等级的模糊综合评价方法
12.
Discussion of method of calculating crack width of permeable lining of pressure tunnel
压力隧洞透水衬砌裂缝宽度计算方法探讨
13.
COMPARISON AND ANALYSIS OF DIFFERENT SHIELD TUNNEL LINING INTERNAL FORCES DESIGN METHOD OF METRO RUNNING
地铁区间盾构隧道衬砌内力计算方法比较分析
14.
The Tunnel Lines with and Builds the Influence Factor of Construction Quality and Controls the Method to Study
隧道衬砌施工质量影响因素和控制方法研究
15.
refractory lining
耐火衬砌, 耐火炉衬, 耐火(材料)衬里
16.
The water-proof and drainage system within the tunnel has adopted the comprehensive treatment project of the combined linings and setting the PVC pellicle in the middle, the connection of the longitudinal, loop pipes and the rubber-sealing belt.
洞内防排水采用复合式衬砌中间设聚氯乙烯薄膜结合纵向、环向盲管及橡胶止水带的综合治理方案。
17.
The vehicle stands on the finished concreted tunnel Base with the direction of travel corresponding to the direction of lining.
车辆位于浇注好的隧道基底上,移动方向与衬砌方向一致。
18.
lining of tunnel and underground works
隧道及地下工程衬砌