1.
Optimize of Ore Pillar Mining Methods Based on Fuzzy Synthetical Judgment
基于模糊综合评判法的矿柱回采方案优选
2.
New Optimization Design Techniques of the Mining Schemes for Underground Metal Mine and Its Application
地下金属矿山回采方案优化设计新技术及其应用
3.
The Research of Reform Layout to KongZhuang Coal Mining Area Dedicated to Specialized Wind Lane
孔庄煤矿采区专用回风巷改造方案研究
4.
Methods The data of116 cases according with requirement were statistically and retrospectively analyzed.
方法采用回顾性研究方法,对116例凶杀案例资料进行统计分析。
5.
Japanese Non-Project Procurement Programme
日本非项目采购方案
6.
square set stope
方框支护回采工作面
7.
The Study of Mining Method the Water Body for South 2 Mining Area;
大平矿南二采区水体下开采方案研究
8.
Central Bosnia Return Programme
中波斯尼亚回返方案
9.
Mining design procedures of the deep mining process sublevel caving stoping method
无底柱分段崩落采矿法回采设计方法
10.
Applying a further development of the SIPI test, the D.C. Circuit agreed.
地区法院巡回法庭同意采用经过延伸的“公共情报有限公司科学家学院”案中的测验方法。
11.
Research of E-procurement Design in Baosteel Company;
电子化采购及宝钢电子化采购方案设计的研究
12.
The Design and Study of Mining Method under the Village for Aiyou Mine 106 Mining Area;
艾友矿106采区村庄下开采方案的设计研究
13.
A Plan for Mining of Complicated Gold Lode in Northern Area of Ying Gezhuang Mine
英格庄北矿区难采金矿脉开采方案研究
14.
The Research and Implementation of Reduction Method in Fully Mechanized Complicated Geological Structure Zone
综采复杂地质构造带缩采方案研究与实施
15.
The payback period can be used to choose among competing alternatives. Using this method, the investment with the shortest payback period is preferred over investments with longer payback periods.
回收期可用于选择竞争性被选方案,回收期短的方案要优于回收期长的方案。
16.
Calculation Method of Annual Mining Recovery Index in Mining Enterprise;
谈矿山企业制定年度开采回采率指标的方法
17.
The exploitation quality digital estimation method of stopes based on actual surveys
基于实测的采场回采质量数字评价方法
18.
Water quality-Technical regulation on the design of sampling programmes
GB/T12997-1991水质采样方案设计技术规定