1.
Role and Editor Program of the "Hebei Province the Cost Quota of Highway Projects"
《河北省公路工程成本定额》的作用及编制程序
2.
gross domestic fixed capital formation
本地固定资本形成总额
3.
On the Comparison of“the Quota Cost Method”and “the Norm Cost Method”;
“定额成本法”与“标准成本法”的比较
4.
recommended departure from the cost basis
按原成本加减一定金额作为计算基础
5.
Those salesmen who go over the top this month will get a bonus.
那些在本月超额完成定额的推销员将会得一笔奖金。
6.
If sales are zero.the maximal loss will be the amount of the fixed coats.
如果收入为零,最大的损失额即固定成本。
7.
Transaction Costs,Contract Flexibility and Huizhou s Fixed-Rent during Ming and Qing Dynasties;
交易成本、合约弹性与明清徽州的定额地租
8.
A Research on the Model of R&D Cost-Reimbursement Based on Quotas in Defense Procurement;
基于定额的国防采购R&D成本补偿模型研究
9.
nominal capital
名义资本,额定资本
10.
gross domestic price capital formation
本地价格资本形成总额
11.
preliminary estimate norms and estimate norms of capital construction
基本建设概算、预算定额
12.
Unamortized balance of deferred costs
递延成本的未报销余额
13.
reduced costs of comparable products
可比产品成本降低额
14.
The production group has overfulfilled the quota today.
今天,这个生产小组超额完成了定额。
15.
determining payment based on the actual cost of production plus an agreed-upon fee or rate of profit.
基于实际成本再加上双方同意的费用或者利润率来确定支付额。
16.
Featherbedding will certainly increase unit costs and, in the general case, prices too.
一般情况下,超额雇工肯定将增加单位成本,并将提高价格。
17.
Design of Production Cost and Stint Statistic Subsystem on Manufacturing Information Management
生产信息管理中生产成本及定额统计子系统的设计
18.
Application of enterprise construction ration compiling and its cost analysis platform;
企业施工定额的编制以及施工成本分析平台的应用