说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 长江江堤
1.
Analysis of monitoring results for seepage in foundation of?Anqing section of Changjiang dike
安庆长江江堤堤基及堤后渗流监测成果分析
2.
Bid invitation practice for concealed works of important dyke along the Yangtze river
长江重要堤防隐蔽工程招标工作实践
3.
The bagged sand core sloping dike structure and its design method in the Yangtze Estuary Deepwater Channel Regulation Project
介绍长江口航道治理工程中袋装砂堤心斜坡堤结构及设计方法。
4.
Bagged Sand Core Sloping Dike Structure and Its Design Method in Yangtze Estuary Deepwater Channel Regulation Project
长江口深水航道治理工程中袋装砂堤心斜坡堤结构设计
5.
Deepened Reform of Levee Construction System --Study on Levee Construction along the Yangtze River;
堤防工程建设体制的深刻变革——对长江堤防工程建设的认识和思考
6.
Research on Yangtze River bank s Frequent in-moving in Wuwei County and Human-environment Relationship of Yangtze River Basin in Qing Dynasty;
清朝无为江堤屡次内迁与长江流域人地关系考察
7.
Study on the Computer Simulation System for failure Process of Yangtze River Embankment
长江堤岸失稳过程计算机仿真系统研究
8.
On the Risk Analysis and Safety Assessment Reseach of the Yangtze River Main Levee;
长江堤防工程风险分析和安全评价研究初论
9.
Application of deep-mixing-pile wall in dike reinforcement and seepage prevention works
深层搅拌桩在长江堤防防渗加固中的应用
10.
Fuzzy self-adapting stochastic damage mechanism for Jingnan main dike of Yangtse Rive
荆南长江干堤模糊自适应随机损伤机理研究
11.
Long distance reclamation for strengthening of Jingjiang Dyke
荆江大堤加固工程中的长排距吹填施工
12.
Design of the Sloping-Faced North Leading Dike With Bagged-Sand Core for the Yangtze Estuary Deepwater Channel Regulation PhaseⅠProject
长江口深水航道治理工程一期工程北导堤袋装砂堤心斜坡堤的设计
13.
The design and construction of the sloping- faced north leading dike with bagged- sand core for the 1st phase of the Yangtze Estuary deepwater channel regulation project are introduced.
介绍长江口深水航道治理一期工程北导堤袋装砂堤心斜坡堤的设计与施工。
14.
Research Calculation for Altitude of River Dike of City;
城市江河防洪堤堤顶高程计算的研究
15.
EFFECT ANALYSIS OF PREVENTING SEEPAGE ENGINEERING IN SHIJIAO SEGMENT OF NORTH RIVER LEVEE
北江大堤石角堤段防渗工程效果分析
16.
The tens of thousands kilometers of Yangtse River embankment has survived the flood started in late August.
万里长江堤防经受住了8月下旬以来的洪水考验。
17.
Formation of Bagged Sand Dike Core and Placing of Sand Cushion
长江口深水航道治理工程袋装砂堤心成型及砂被铺设施工工艺
18.
The Research on Grab Thin Concrete Diaphragm Wall and Its Applying in Levee Strengthening of Changjiang River;
薄型抓斗塑性混凝土防渗墙技术研究及在长江堤防治理中的应用