1.
Study on the Stability of the Spandrel Groove High Slope of Jinping Hydroelectric Power Station;
锦屏一级水电站拱肩槽边坡稳定性研究
2.
DEFORMATION RESPONSE OF HIGH ROCK SLOPE EXCAVATION AT A LARGE HYDROELECTRIC STATION IN SOUTHWEST CHINA
西南某大型水电站拱肩槽边坡开挖的变形响应研究
3.
Analysis of Stability for the Right Spandrel Groove Slope of Jinping I Hydropower Station
锦屏一级水电站右岸拱肩槽边坡稳定性分析
4.
Analysis and Evaluation on Stability of Slope at Left Spandrel Groove of Jinping First Stage Hydropower Station in Construction
锦屏一级水电站左岸拱肩槽边坡施工期稳定性分析与评价
5.
STUDY ON THE STABILITY OF SPANDREL GROOVE HIGH SLOPE OF XILUODU HYDROELECTRIC POWER STATION;
溪洛渡水电站供肩槽高边坡稳定性研究
6.
The Geological Evaluation of the Rock Mass Engineering after the Excavation of the Spandrel Trough between the Banks of Xi Luo Du Hydropower Station;
溪洛渡水电站高拱坝两岸拱肩槽开挖后岩体工程地质评价
7.
Analysis of Initial Stress Field Regression and Excavating Abutment High Slope Using Three-dimensional Nonlinear Finite Element Method on Jinping;
锦屏水电站地应力场回归分析与坝肩槽开挖高边坡稳定性三维非线性有限元分析
8.
PRECISION BLASTING CONSTRUCTION OF SPANDREL GROOVE FOUNDATION PLANE EXCAVATION IN XILUODU HYDROPOWER STATION
溪洛渡水电站右岸拱肩槽建基面开挖精细爆破施工
9.
Study on the Stability of the Abutment of Changheba Hydroelectric Power Station in Dadu River
大渡河长河坝水电站坝肩边坡稳定性研究
10.
Numerical Research on the Stability of the Right Abutment Slope of Luding-dam
泸定水电站右坝肩边坡稳定性的数值研究
11.
Engineering Geology Research on Bounderary Condition of Dam Abutment Resisting Force Body of Dagangshan Hydroelectric Power Station on Dadu River
大渡河大岗山水电站拱坝坝肩抗力体边界条件工程地质研究
12.
The Analysis of Right Bank Dam Abutment Slope Stability and Research of Reinforcing Scheme of Dongfeng Hydropower Station
东风水电站右坝肩边坡稳定分析及加固处理方案研究
13.
Study on the Stability and the Measure of the Control of the Left Bank Abutment High Slope of the Jinanqiao Hydroelectric Power Station
金安桥水电站左岸坝肩高边坡稳定性与治理措施研究
14.
Mechanism Analysis on Deformation of Excavation Slope on the Left Bank Accumulation Body of Xiluodu Hydropower Station;
溪洛渡水电站左岸谷肩堆积体开挖边坡变形机制分析
15.
THE STABILITY RESEARCH OF THE LEFT ABUTMENT SLOPE IN LIANGHEKOU HYDROELECTRIC POWER STATION OF THE YALONG RIVER
雅砻江两河口水电站左坝肩心墙边坡稳定性研究
16.
FAILURE MODE AND STABILITY ANALYSIS OF LEFT BANK ABUTMENT HIGH SLOPE AT JINPING I HYDROPOWER STATION
锦屏I级水电站左岸坝肩边坡施工期破坏模式及稳定性分析
17.
Technique of construction of pre-stressed anchor bar for strengthening of high slope on right bank abutment of dam for Xiluodu Hydropower Station
溪洛渡水电站右岸坝肩高边坡预应力锚杆施工技术
18.
Stability Analysis on Side Slope in the Spillway Chute Pubugou Hydroelectric Power Station under Different Function of Releasing Floodwater;
大渡河瀑布沟水电站溢洪道陡槽段雾化边坡稳定性研究