1.
This paper introduces racing of original integrated operation characteristic curves and efficiency curves after uprating and refurbishing hydrogenerator of shangyoujiang power plant.
介绍上犹江水电厂水轮机增容改造后的效率试验过程及效率曲线与运转综合特性曲线的绘制。
2.
The Research of Rehabilitating and Enhancing for Hydroelectric Set in Liujiaxia Hydropower Plant;
刘家峡水电厂水轮发电机组增容改造分析研究
3.
Force Characteristic Test Technology and Application on Capacity-plus Transformation of Hydroelectric Generating Set
水轮发电机组增容改造力特性测试技术及应用
4.
Hydraulic Turbine Model Acceptance Test of No.2 Unit of Xinanjiang Hydropower Station
新安江水电厂2#机增容改造水轮机模型验收试验
5.
Economic Evaluation on Capacity Upgrade Project of 300 MW Home-made Turbine
国产300MW汽轮机增容改造经济性评价
6.
Study on Technology of Ventilation and Strand Transposition in Capacity-increasing through Retrofiting for Large-scale Hydro Power Generator
大型水轮发电机增容改造中股线换位和通风技术的研究
7.
A capacity? increasing transformation is needed to improve the output of No.2 water turbine in Fengshuba Hydropower Plant.
为了提高枫树坝水电厂2号水轮机出力,需要对水轮机进行增容改造。
8.
Runner structural design for hydropower station upgrade project
浅谈水电站增容改造中的转轮结构设计
9.
Updating and Retrofitting Capacity of QFS Type 300MW Turbo-Generator and Its DCS Reconstruction;
QFS型300MW汽轮发电机增容及其DCS系统改造
10.
Research on the Capacity Increase and Transformation of Generators Based on the Engineering Practice;
基于工程实践的汽轮发电机组增容改造的研究
11.
The Feasible Research of the Capacity Improvement for the 100MW Unit of LianCheng Power Station;
连城电厂100MW汽轮机节能和增容改造可行性研究
12.
Retrofit and Design of Increasing Capacity and Cavitation Resistance of Hydraulic Turbine for Guanan Gaoqiao Power Station;
广安高桥水电站水力机组增容防蚀改造设计
13.
Brief discussion of speed-governing system reconstruction for hydraulic turbine
水电站水轮机调速系统改造技术分析
14.
System Optimization Uprating Modification for 300MW Units in Yudong Power Plant
裕东电厂300MW机组系统优化与增容改造
15.
Technological Transformation on Thrust Bearing Shed Oil of Hydrogenerator;
水轮发电机推力轴承甩油的技术改造
16.
The Retrofitting of Turbine Drainage System of Feed Pump for Huadian Tieling Power Plant
华电铁岭发电公司给水泵汽轮机疏水系统改造
17.
Reconstruction of automatic component of water impeller power generator set for Lianhua hydraulic power plant
莲花水电厂水轮发电机组自动化元器件改造
18.
The use of Hydraulic Fill Techniques on the Market for Power Plant Ash Transformation Compatibilizer
采用水力冲填法对发电厂贮灰场进行增容改造