说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 冻土工程地质条件
1.
Railway Route Selection Principles Based on the Classification of Engineering Geological Condition in Permafrost Regions
基于多年冻土工程地质条件分级的铁路选线原则
2.
Ground Subsidence Control and Engineering Application of Construction of Shallow Tunnel in Loess
黄土地质条件下浅埋暗挖施工地表沉降控制及工程应用
3.
Study on Engineering Geological Properties and Settlement of Turfy Soil in Seasonal Frozen Region;
季冻区草炭土工程地质特性及变形沉降研究
4.
PERMAFROST ENGINEERING GEOLOGICAL CHARACTERISTIC AND DISCUSSION OF ROUTE SELECTION IN QINGHAI-TIBET PLATEAU
青藏高原冻土工程地质特性与选线原则探讨
5.
The railway will pass areas with complex geological conditions, including a 550-km-long frozen soil section.
沿线地质条件复杂,经过多年连续冻土地段550公里。
6.
Test Research on Frost Heave of Soils under Different Artificial Freezing Conditions;
不同人工冻结条件下土的冻胀试验研究
7.
Study on the Engineering Property of Silty Clay in Frozen Zone and the Stability of Roadbed in Naquhe Region of Qinghai-Tibet Railway;
青藏铁路那曲河地区冻土区粉质粘土工程性质及路基稳定性研究
8.
Experimental Study on Freeze-thaw Process of Soil after Autumn Irrigation
冬灌条件下土壤冻融过程的试验研究
9.
Geological Conditions Distribution and Retaining and Protecting Structures Choice for Deep Foundation Excavation in Guangzhou
广州市岩土工程地质条件分区及基坑支护方案选型
10.
Study on the Engineering Property、Structure and Component of Artificially Frost-thawed Soils of Main Well in the Liuzhuang Coal Mine of Huainan;
淮南刘庄煤矿主井地基人工冻融土工程性质与结构成分的研究
11.
Engineering Geological Research on the Permafrost in High Latitudes Area and Its Impact on Pipeline Construction;
高纬度地区管道建设中的冻土工程地质问题研究
12.
Engineering Geological Conditions of Tunnel Passage (East Line) between Shanghai and Chong Ming
沪崇越江通道(东线)工程地质条件
13.
Complicated geological condition fabrication cost of foundation works control;
复杂地质条件下基础工程的造价控制
14.
Talking about the Engineering Geological Condition of Spillway Tunnel of Qianian Reservoir and Its Evaluation
千年水库泄洪洞工程地质条件及评价
15.
Evaluation on the Engineering Geologic Conditions of the Flood Spillway of Zhangfeng Reservoir
张峰水库溢洪道工程地质条件及评价
16.
Study of the Engineering Geological Problems in Permafrost Region along China-Russia Oil Pipeline and Prevention Countermeasures
中俄输油管道沿线多年冻土工程地质问题及防治对策
17.
Zonation and assessment of engineering geology for frozen-ground environments and conditions along the proposed China-Russia Crude Oil Pipeline route
中俄管道(漠河—乌尔其段)多年冻土环境工程地质区划和评价
18.
Experimental study on thawing subsidence characters of permafrost under frost heaving and thawing circulation
冻融循环条件下土的融沉性质试验研究