1.
Mechanical Simulation and Analysis of Metro Station on the New Line Cross the Existing;
地铁新线车站穿越既有线车站的施工力学分析
2.
Techniques of Deformation Control for Subway to Traverse Existing Railway Line
城市地铁穿越既有线路的变形控制技术及效果
3.
Shield-driven Construction Cross Existed Line Ground Settlement Regularity & Parameter Optimization;
盾构施工穿越既有线地表沉降规律与施工参数优化
4.
The Application Research of Micro-settlement Control Technology in Underpinning Engineering of Tunnel Through the Existing Subway Line
隧道穿越既有线托换施工中的微沉降控制技术应用研究
5.
Study on Construction Technology of the Soft Rock Tunnel Passing Througy Existing Railway;
穿越既有铁路的软弱围岩双线隧道施工技术
6.
Research on Influences of Dubble-Tube Shield Tunneling on Deformation of Upper Exisiting Structures
双线盾构隧道穿越对既有结构变形的影响研究
7.
The Research for the Influence of Slurry Shield Passing Beneath the Existing Tunnel and the Construction Parameters
泥水盾构穿越既有隧道的影响及施工参数研究
8.
Deformation Control of Crossing Over Existing Bridge by Shallow Tunneling
地铁浅埋暗挖法穿越既有桥梁施工变形控制
9.
Discussion on the construction craft of tunnel in passenger dedicated highway line underpasses through established railway pipe roof
客运专线隧道下穿既有铁路管幕施工技术
10.
Research on the Impact of Construction of Box Culvert Underpass the Existing Highway on Environment
既有线下穿箱涵工程对周围环境影响的研究
11.
Influence Analysis of Safety Operation of New Metro Affect Exist Metro in Metro Crossing Engineering
地铁穿越工程中新建地铁对既有地铁安全运营的影响分析
12.
not traveled over or through.
没有穿越或穿行的痕迹。
13.
Research on the Effection and Deformation Control of Double-line Tunnel Undercrossing Existing Subway Station
双线暗涵近距离下穿既有地铁车站的影响及变形控制研究
14.
Study on Undercrossing Existing Metro Station Construction Scheme of Beijing Metro Line 4 Xuanwumen Station
北京地铁四号线宣武门站下穿既有车站施工方案研究
15.
Remote monitoring system applied to the construction of metro station undercrossing existing metro tunnel
地铁车站下穿既有线隧道施工中的远程监测系统
16.
Not everyone imagined the journey across the partition line would be final.
然而,并不是所有人都能想象到一旦他们穿越了分界线就永无回程。
17.
Across the course, line, or length of.
横越…的航道穿过(船)的航向,航线或路线
18.
On analysis of shield construction through existing subway in running tunnel
盾构施工下穿既有地铁区间隧道分析