1.
The PM Design of "One Megaton a Year Delayed Coking Engineering";
“100万吨/年延迟焦化工程”PM设计
2.
On Fire Risk of Coking Works and Fire Design
煤焦化工程火灾危险性及消防设计探析
3.
Power Generation Project of Coking Chemistry 125t·h~(-1) Dry Quenching
炼焦化学125t·h~(-1)干熄焦发电工程
4.
Evaluation of Occupational Hazard Control Effect in The Coke Oven Project of A Coking Plant
某焦化厂焦炉工程职业病危害控制效果评价
5.
coke oven plant
炼焦炉工厂,焦化厂
6.
Model Development of Coke Oven Cokemaking Process--Model Development of Steam Changing Process in the Coke Oven and Industrial Test (Ⅲ)
焦炉焦化模型开发——炉内水分变化过程模型及工业验证(Ⅲ)
7.
Treatment of Coking Wastewater by Shortcut Nitrification-Iron-carbon Micro-electrolysis Process
短程硝化—铁炭微电解工艺处理焦化废水
8.
The Manufacture of Military Engineering Minisize Split FPA Dewar
军用工程化微型分置式焦平面杜瓦的研制
9.
The Base Research on the Combined Processes of Once Through Coking and Heavy Coker Wax Oil Cracking;
重蜡油裂解—单程焦化组合工艺基础研究
10.
Reformation and Design of Unit of 1500kt/a Delayed Coking;
150万吨/年延迟焦化装置改造和工程设计
11.
COKING PROPERTIES OF COKER GAS OIL IN CATALYTIC CRACKING REACTION PROCESS
焦化蜡油催化裂化反应过程生焦特性
12.
Installation of the Transformation from Single Thermal Coke Oven to Complex Thermal
单热式焦炉改复热式焦炉的工程安装
13.
COMPARISON OF CONVENTIONAL AND TUNABLE RECYCLE RATIO PROCESS FOR DELAYED COKING PLANT
延迟焦化传统流程与可调循环比流程的工艺比较
14.
The coking wastewater is a kind of intractable wastewater from the coking products of coal, whose component of this waste water is complicated and difficult to treat.
焦化废水是煤制焦化产品回收过程中产生的废水,其成分复杂多变,属于难处理的工业废水。
15.
Selection of Processes for Desulfurization and Decyanation of Coke Oven Gas
焦化厂焦炉煤气脱硫脱氰工艺的选择
16.
CAUSES OF SHOT COKE FORMATION IN DELAYED COKING UNIT AND COUNTERMEASURES
延迟焦化工艺弹丸焦形成原因和对策
17.
Many chemical engineers feel that optimising existing plants will become the chemical industry' s focus, rather than expanding them.
许多化学工程师们认为,化学工业的发展焦点在于使现有工厂最优化,而不在扩大规模。
18.
THE APPLICATION OF DURAFIBER CONCRETE IN THE CONSTRUCTION OF COKE PAGODA PLANK IN PETROL-CHEMICAL PROJECTS
石化工程焦碳塔框架大厚板采用杜拉纤维混凝土