1.
Effect of height of second-stage cooling on concrete thermal creep stress
二期冷却高度对混凝土温度徐变应力的影响
2.
Comparison of Second Stage Artificial Cooling Schemes in Xiaowan Arch Dam
小湾拱坝二期冷却方案温控措施对比分析
3.
Source Terms Calculation Analysis for the Reactor and Primary Coolant System of Qinshan Phase II NPP Project
秦山核电二期工程反应堆及反应堆冷却剂系统源项计算分析
4.
Design of the Reactor and Reactor Coolant System for Qingshan Phase II NPP Project
秦山核电二期工程反应堆及反应堆冷却剂系统设计
5.
Mechanical Analysis of Reactor Coolant System for Qinshan Phase II NPP Project Main Coolant System and Auxiliary System
秦山核电二期工程反应堆主冷却剂系统与辅助系统力学分析
6.
A Lifetime Model for Controlling Slab Caster's Secondary Cooling System
板坯连铸二次冷却系统控制模型中的生命周期模型
7.
cooling-off period(in industrial disputes)
(劳资纠纷中的)冷却期.
8.
co3 graphite reactor
二氧化碳冷却石墨慢化反应堆
9.
It is cool and filter the precipitated caesium dichloroiodide.
这是冷却,滤出沉淀的二氯碘化铯。
10.
Research on Secondary Cooling of Billet for ROKOP Continuous Casting Machine of Chuanwei Irom & Steel Group Co.;
威钢ROKOP高效方坯连铸二次冷却的研究
11.
The Effects of HPCD (High Pressure Carbon Dioxide) on the Quality of Chilled Pork
高压二氧化碳对冷却猪肉品质的影响
12.
Cooling-off period is three years and references only former employees of the company.
冷却期”为三年,并仅针对公司前雇员。
13.
Research on the Technology Used in Extending Shelf Life of Chilled Beef
冷却牛肉延长保鲜期的应用技术研究
14.
Chemical Treatment of Recirculation Cooling Water System in The Early Stage after Completion
循环冷却水系统建成初期的化学处理
15.
"Eliminates the need for periodic flushing and steam-cleaning commonly associated with "sewage cooled"designs"
"不需要像""污水冷却""设计系统那样定期冲刷和清洗冷却。"
16.
Initial cost is comparable to that of by-pass cooled or external cooled jacketed motor. The self-contained cooling system eliminates the need for an external water supply.
初期购置成本与旁路冷却或外部冷却加套方案相当。这种独立冷却系统不需要配置外部水源。
17.
condenser air cooling
(空气冷却) 冷凝管
18.
coolant mechanism
冷却装置,冷却机理