说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 可中断负荷管理合同
1.
AN INCENTIVE COMPATIBLE CONTRACT FOR INTERRUPTIBLE LOAD MANAGEMENT IN ELECTRICITY MARKET;
一种激励相容的电力市场可中断负荷管理合同模型
2.
Analysis of Interruptible Load in Power Demand Side Management;
电力需求侧管理中可中断负荷的研究
3.
Interruptible load management in power market and interim system Part 2 Operation of interruptible load;
电力市场和过渡期电力系统可中断负荷管理(二)——可中断负荷运营
4.
Research on Hangzhou Interruptible Load Management;
杭州地区可中断负荷管理模式的研究
5.
Research on Interruptible Load Management Via Price Incentives
基于价格激励可中断负荷管理的研究
6.
Study on Interruptible Load Contracts by Applying Incentive and Insurance Mechanism;
引入激励与保障机制的可中断负荷合同研究
7.
Market value evaluation of multi-period interruptible load contracts;
多时段可中断负荷合同的市场价值评估
8.
Customer Value Evaluation and Interruptible Load Management in Popular Project;
民心工程中的客户价值评价与可中断负荷管理
9.
Incentive Interruptible Load Management Considering Risk Factors;
考虑风险因素的激励性可中断电力负荷管理
10.
RESEARCH ON PRICING MODEL OF CONGESTION MANAGEMENT CONSIDERING INFLUENCE OF PARTITIONED INTERRUPTIBLE LOAD;
计及可中断负荷影响的阻塞管理定价模型研究
11.
Interruptible load management and its methods in electricity market;
电力市场下的可中断负荷管理及其方法
12.
Interruptible load management in power market and interim systemPart 1 Cost-benefit analysis of interruptible load;
电力市场和过渡期电力系统可中断负荷管理(一)——可中断负荷成本效益分析
13.
MODELING AND IMPLEMENTATION OF INCENTIVE INTERRUPTIBLE LOAD CONTRACTS IN ELECTRICITY MARKETS;
电力市场中激励性可中断负荷合同的建模与实施研究
14.
A distribution mechanism of interruptible loads tariff compensation based on cooperative game;
合作博弈下的可中断负荷补偿电费分配机制
15.
The Integrative Evaluation and Management of Interferential Load in Electric and Power Market;
电力市场中干扰性负荷的综合评估与管理
16.
An evaluating model of interruptible load uncertain risks and returns based on evidence theory
基于证据理论的可中断负荷不确定性风险收益评估模型
17.
Load Shedding Strategies of Power Supplier Considering Impact of Interruptible Loads on Spot Price
计及可中断负荷对现货电价影响的供电商负荷削减策略
18.
Research on Pricing and Implement Mechanism Problem of the Interruptible Load Management Project;
可中断负荷项目中的定价问题及实施机制