1.
Construction and Organization of Steel-Box Girder Crossing Expressway Tunnel of Huangpu Highway
跨黄埔大道车行隧道钢箱梁的施工与组织设计
2.
Deep Base Soil Nail Supporting Design:A Case Study of Sub-Pavement Tunnel s Construction in Bo ai Road;
深基坑土钉支护设计——以博爱路下穿车行隧道施工为例
3.
Eastern Harbour Crossing road tunnel area
东区海底隧道行车隧道区
4.
running tunnel [Mass Transit Railway]
行车隧道〔地下铁路〕
5.
It was used by about 6 000 vehicles daily.
隧道免费行车,每日行车量约6000架次。
6.
Study on Mechanical Behavior during Large-span Tunneling and Closely-spaced Tunneling of Multiple Tunnels Region in Metro Station
大跨度车站进入区间隧道多洞地段隧道施工力学行为研究
7.
Its capacity of 180 000 vehicles per day is about 50 per cent higher than that of the other two cross-harbour road tunnels.
该隧道的行车量每日可达18万架次,比其他两条海底行车隧道的行车量高出一半左右。
8.
Study on the heat transfer and practice of low heat accumulation kiln cars
隧道窑低蓄热窑车传热行为的研究与实践
9.
Design of Low Heat Accumulation Kiln Cars and Study on the Heat Transfer of Vehicle Linings in a Tunnel Kiln
隧道窑低蓄热窑车的设计与传热行为的研究
10.
Study on Relationship between Road Tunnel Ventilation Lighting and Traffic Safety;
公路隧道通风照明与行车安全关系研究
11.
The Study about Operating Speed Model of Tunnels and Interchange Zone in Express Highway
高速公路隧道及互通区运行车速模型研究
12.
The truck cleared the tunnel safely.
卡车安全地通过了隧道。
13.
We drove through the tunnel.
我们开车穿过了隧道。
14.
The train disappeared into the tunnel.
火车消失在隧道内。
15.
The express train went through the tunnel .
特快列车穿过隧道。
16.
The WHC is a dual three-lane, immersed-tube road tunnel linking the West Kowloon Expressway with the Western District.
西区海底隧道是一条双程三线沉管行车隧道,连接西九龙快速公路与港岛西区。
17.
Study on Mechanical Behave of Metro Station for Three Parallel Tunnels Based on Shield Tunnel and NATM;
配合盾构法修建三条平行隧道地铁车站的力学行为研究
18.
"Chunnel:underwater tunnel for the passage of motor vehicles, especially one under the English Channel."
隧道:车辆通过的水下隧道,特指英吉利海峡下的隧道.