1.
Qinshan Phase Ⅲ (CANDU) Nuclear Power Porject Quality Assurance
秦山三期(重水堆)核电站工程质量保证
2.
A Progress Survey of Qinshan Phase Ⅲ (CANDU) Nuclear Power Plant Project
秦山三期(重水堆)核电站工程进展概况
3.
Technical improvement in Qinshan Phase Ⅲ nuclear power plant after commercial operation
秦山三期(重水堆)核电站的技术改进
4.
Design and Application of Refueling Management Information System for Qinshan Phase Ⅲ;
秦山三期换料管理信息系统的设计和应用
5.
The Research on the Gaseous ~(14)C Releasing Mechanism of the Third Qinshan Nuclear Power Plant;
秦山三期核电站气态流出物C-14释放机制研究
6.
Reseach on Refueling Channels Selection Optimization Software s Application in QINSHAN PHASE Ⅲ;
换料通道优化选择软件在秦山三期的应用研究
7.
QINSHAN PHASE Ⅲ Human Factor Event Analysis and Countermeasure Research;
秦山三期核电站人因事件分析和对策研究
8.
TQNPC Primary Heat Transport Pump Shaft Vibration Diagonosis and Solutions;
秦山三期主冷却剂泵轴振动问题诊断与处理
9.
Study on Stock of Spare Parts of Qinsan Phase Ⅲ Candu Nuclear Power Station;
秦山三期重水堆核电站备品备件库存研究
10.
Optimization of the production plan and risk control in Third Qinshan Nuclear Power Co.,Ltd.
优化秦山三期生产计划及风险控制管理
11.
Modification of Human Reliability Analysis Using HCR Combination with THERP in Third Qinshan NPP PSA;
利用THERP与HCR相结合的方法对秦山三期PSA人因可靠性进行修正
12.
Reflections on Owner s Practice of Project Cost Control in the Construction of Qinshan Phase Ⅲ Nuclear Power Project;
业主在秦山三期建设工程中工程造价控制的实践与思考
13.
Screening and Optimizing of Nuclear Grade Resin in TQNPC;
秦山三期核级树脂筛选及相关技术指标优化研究
14.
Study on Disposal Radioactive Noble Gas Using Absorption of Active Carbon in Third Qinshan Nuclear Power Company (TQNPC);
活性炭吸附技术在秦山三期放射性惰性气体处理中的应用研究
15.
Simulation Modeling and Process Study of the Third Qinshan Nuclear Power Plant Steam Generator Water Level Control;
秦山三期蒸发器液位控制模型的建立与特性研究
16.
ANALYSIS OF EFFLUENCE TRITIUM RELEASE FROM QINSHAN PHASE Ⅲ HEAVY WATER REACTOR
秦山三期重水堆核电站流出物氚排放的比较分析
17.
The reactor core structure of Qinshan phaseⅢ CANDU nuclear power plant include several major components such as the calandria, calandria vault, fuel channels and reactivity control unit.
详细描述了秦山三期CANDU核电厂的堆芯结构,堆内构件的组成及其功能。
18.
Reactor Building Pressure Proof Test (PPT) & Leak Rate Test (LRT) of Qinshan Phase Ⅲ(CANDU) Project