说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 桩坝
1.
Study on Mechanism and Effect of Flow Control and Aggradation for Permeable Pile Dike;
透水桩坝工程导流落淤效果和机理试验研究
2.
An Analysis of the Abutment with Transmission Piles of the Shuangjiang Arch Dam by Means of the FEM
双江拱坝传力桩加固坝肩的有限元分析
3.
Application of gunite pile construction technology in dam foundation anti-seepage project at Baihe rubber dam
喷浆桩施工技术在白河橡胶坝坝基防渗抗冲中的应用
4.
Application of Mixing Pile Cutoff Seepage Wall in the Dam Reinforcement Construction
搅拌桩截渗墙技术在堤坝加固中的应用
5.
Erosion and siltation study for low sheet-pile groins under tidal bore
涌潮条件下排桩式低丁坝水力学冲淤试验研究
6.
Effect of sheet-pile groins on protecting dykes and flats in tidal bore estuary
涌潮河口桩式丁坝的护滩保塘效果分析
7.
Study on Calculation Method for Surface Curves Above Single Row Permeable Pile Groin
单排井柱桩透水丁坝上游水面线计算研究
8.
Water Diversion and Retarding Action Effect of Single Permeable Pile Groins
单排井柱桩透水丁坝的分水缓流作用效果
9.
APPLICATION OF VIBRO REPLACEMENT STONE COLUMN IN LONGTOUSHI DAM CREST REINFORCEMENT
振冲碎石桩在龙头石水电站坝基加固中的应用
10.
In-Situ Test and Numerical Analysis of Bore Pressuure on Sheet-Pile Groin in Qiantang River
钱塘江排桩式丁坝上涌潮压力现场测试及数值分析
11.
Numerical Simulation and Dynamic Characteristics Research of Sheet-Pile Groin under the Impact of Bore
涌潮冲击排桩式丁坝的数值模拟和动力性状研究
12.
Application of Cement Mixing Pile to Strengthen Complex Foundation--Study on Dividing Yi River into Shu River;
深层搅拌桩技术在分沂入沭拦河坝基础处理中的应用
13.
Study on Permeable Pile Groin and Sediment Regulation Approaches of the Main Tarim River;
塔里木河干流泥沙治理途径及井柱桩透水丁坝研究
14.
The Sedimentologic Characteristics of Beach and Bar in the upper 4th Member of Shahejie Formation (E_2~2S_4~U), Zhuangxi Area of Zhanhua Depression
沾化凹陷桩西地区沙四上亚段滩坝砂体沉积特征研究
15.
Theoretical Study on Calculation of Scouring Depth and Backwater Height Associated with Pile Permeable Spur Dike
正挑桩式丁坝壅水特性及其冲刷深度计算模式理论
16.
These problems are discussed in the light of the construction of the steel tubular pile foundations for Bahekou Heavy Cargo Wharf in the Three Gorges and Yangjiawan Container &General Cargo Wharf.
文章依托三峡坝河口重件码头和杨家湾集装箱杂货码头钢管桩基础工程,探讨了以上问题。
17.
Following the in-situ test of bore pressure on the sheet-pile groin, this paper makes a systematic study on the bore pressure and dynamic response of the sheet-pile groin.
本文结合现场试验,对排桩式丁坝上的涌潮压力和动力响应进行了比较系统的研究。
18.
(3)The distribution of the bore pressure along vertical space which is a new type loading mode for the design of pile-groin.
(3)涌潮压力在垂线方向上的分布。 为排桩式丁坝的设计提出了新型的受力模式。