1.
Handling Patterns of Goods & Materials of Jiangpinghe Hydropower Station;
江坪河水电站工程物资供应管理方式
2.
Test Research about the Cofferdam Anti-seepage Scheme at Jiangpinghe Hydroelectric Power Station
江坪河水电站围堰防渗方案试验研究
3.
An Analysis of Surrounding Rock Stability of Diversion and the Generating Tunnel of the Jiangpinghe Power Station
江坪河水电站引水发电洞围岩稳定性分析
4.
Simulation analysis of stability of spillway tunnels of Jiangping River Hydropower Station
江坪河水电站溢洪洞围岩稳定性仿真分析
5.
Stability Anslysis of Underground Cavern of Jiangping River Hydropower Station and Support Measure
江坪河电站地下洞室稳定性分析及支护措施
6.
Cause of Formation of the Dam Zone Red Mud-intercalated and Relaxed-tension Rock Mass and Its Influence on the Engineering in Jiangpinghe Hydroelectric Power Station;
江坪河电站坝址红色夹泥、卸荷拉裂岩体成因及对工程影响研究
7.
The Power Intake Structure Optimization Test for the Expansion Works of the Heping Hydropower Plant in Ya'an City
雅安市河坪水电站扩机工程取水口结构优化试验
8.
Study of Genetic Mechanism about Dolomite Sandification in the Site Area of Pingtou Hydroelectric Station of Meigu River and Its Influence on the Project;
美姑河坪头水电站厂址区白云岩砂化成因及其对工程影响研究
9.
Study on the Stability of the Ancient Landslide of Ergu Groove-Wanbo Groove of Meigu Pingtou Hydropower Station
美姑河坪头水电站尔古沟—万波沟古滑坡稳定性研究
10.
Huangjinping hydropower station is one of the large-scale step hydropower projects to be developed on Daduhe River recently.
黄金坪水电站是大渡河流域水电梯级近期开发的大型水电工程之一。
11.
Construction Scheme of Subsequent Project of Cascade Hydropower Station in Songjianghe;
松江河梯级水电站后续工程建设方案探讨
12.
Study on Eco-Environmental Water Demand about the Segment of Water Reduced for the Jinping Second Class Hydropower Station of Yalong River;
雅砻江锦屏二级水电站减水河段生态环境需水研究
13.
The Jiaojigou Debris Flow s Development Character and Fatalness Evaluating about Dadu River Huangjinping Power Station;
大渡河黄金坪水电站近坝库区叫吉沟泥石流发育特征及危险性评价
14.
Installation of guidevane mechanism of hydro-turbines of Liushuping Hydropower Station
柳树坪水电站水轮机导水机构安装调整
15.
Relay protection design of generator-line unit in Jinniuping Hydropower Station
金牛坪水电站发电机-线路单元的继电保护设计
16.
The Study of Glacioflurial Deposit Slop s Stability Nearby Da Du River s Shuang JiangKou Power Station;
大渡河双江口水电站近坝段冰水堆积体稳定性研究
17.
The Study of Ye Long Glacioflurial Deposits Stability Nearby Da Du River's Shuang Jiang Kou Power Station
大渡河双江口水电站近坝库岸业隆冰水堆积体稳定性研究
18.
Method for Calculating Setting Elevation of Hydraulic Turbine of Laojiangdi Water Power Plant in Huangnihe River
黄泥河老江底水电站水轮机安装高程的计算方法