1.
A Study for the Effect of Er'tan Hydropower Project on the Ecological-Geological Environment;
二滩水电工程对库区生态地质环境影响的探讨
2.
Appraisal on Supervision Work of Arch Dam Works of Ertan Hydropower Project;
二滩水电站拱坝工程监理工作后评估
3.
Summarization on the design of 6.3/0.4kV drainage transformer substation on plunge-pool at Ertan Hydropower Station
二滩水电站水垫塘6.3/0.4kV排水工程设计综述
4.
Supervision on Installations of Gates and Hoists in te Bid Ⅱ Project at the Ertan Hydropower
二滩水电站Ⅱ标工程闸门与启闭机的安装监理
5.
Static electric field of 550kV circuit breaker in GIS of extension project at Ertan hydropower station
基于二滩水电站550kV扩建工程GIS断路器静电场分布
6.
Financing for the Longtan Hydropower Project and its funds management;
龙滩水电站工程融资和资金使用管理
7.
Summary on the construction of sealing the roof of powerhouse of Fengtan hydropower station expansion works
风滩水电站扩建工程发电厂房封顶施工综述
8.
Numerical Simulation of Planar 2D Flow of Chongqing Cuntan Phase Ⅲ Project
重庆寸滩三期工程平面二维水流数值模拟
9.
Investigation and Design Process and Features of Gelantan Hydropower Station
戈兰滩水电站工程勘测设计过程及特点
10.
Concrete Construction Plan of Motan Hydroelectric Station’s Diversion Dam
磨滩水电站拦河坝工程混凝土施工方案
11.
Software Development and Study of Anticollision System of LongTan Hydroelectric Construction Equipments;
龙滩水电工程设备防撞系统的软件开发与研究
12.
Baihetan Hydropower Project on Jinshajiang River and timing of project construction;
金沙江白鹤滩水电站工程建设时机的选择
13.
Study on the Stability of Engineering Slope of Baihetan Hydroelectric Power Station
金沙江白鹤滩水电站工程边坡稳定性研究
14.
Brief Introduction of Smooth Transition from Project Construction to Production of Longtan Hydropower Station
龙滩水电站工程从建设向生产运行的平稳过渡
15.
Classification and Mechanical Properties of Surrounding Rocks at Expansion Project of Yantan Hydropower Station
岩滩水电站扩建工程围岩分级及其力学特性
16.
Application of Consolidation Grouting without Cover Weight in Goupitan Hydropower Station Project
无盖重固结灌浆在构皮滩水电站工程中的应用
17.
The Characteristics of Methane Gas Emissions from Ertan Reservoir in Yalong River Step Hydropower Development Process
雅砻江梯级水电开发过程中二滩水库甲烷气体排放特征研究
18.
The Risk and Scheme Analyses of Fast Implementing in the Project of the Left Export Hole at LongTan Hydropower Station;
龙滩水电站左岸导流洞工程快速施工风险及方案分析