您的位置:首页 -> 句库 -> 右岸导流洞
1.
Water Guiding Tunnel Slope Stability Analysis in Right Bank in JinChuan Hydro-power Station;
金川水电站右岸导流洞进水口边坡稳定性评价
2.
Construction Technology for Transition Section of Diversion Tunnel at Left Bank of Guandi Hydropower Station
官地水电站右岸导流洞进口渐变段施工技术
3.
Study on Stability of the Quasi-bedded and Counter-tilt Rock Slope in Right Bank Diversion Tunnel Inlets of Nuozhadu Hydropower Station;
糯扎渡水电站右岸导流洞进口似层状反倾岩质边坡稳定性研究
4.
Blasting Demolition Technology of Cofferdam at the Entrance and Exit of Right Diversion Tunnel in Jinping Stage I Hydropower Station
锦屏一级水电站右岸导流洞进出口围堰爆破拆除安全技术
5.
FEM CALCULATION OF HIGH INLET SLOPE OF DIVERSION TUNNEL ON RIGHT BANK OF CHANGHEBA HYDROPOWER STATION
长河坝水电站右岸导流隧洞进口高边坡稳定性有限元计算分析
6.
Three Gorges Right Bank First-stage River Diversion Concrete Dam Body Joint Grouting
三峡右岸一期导流工程混凝土坝体接缝灌浆
7.
Slope Stability Analysis and Countermeasures of Intake Diversion Tunnel at the Left Bank of Longtan Hydropower Station;
龙滩电站左岸导流洞进水口边坡稳定分析及防治对策
8.
The Risk and Scheme Analyses of Fast Implementing in the Project of the Left Export Hole at LongTan Hydropower Station;
龙滩水电站左岸导流洞工程快速施工风险及方案分析
9.
Analysis of the Stability of the Slope of the Outlet Section of Spillway Tunnel of Luding Hydropower Station;
泸定水电站右岸泄洪洞出口边坡稳定性研究
10.
Analysis and Research on the Scheme of Right-bank Flood Discharge Grotto in GongBoXia Hydro-power Station;
公伯峡水电站右岸泄洪洞方案分析及研究
11.
Process Control and Countermeasures to Cavern Excavation in Right Bank of Jinping Hydropower Station Dam
锦屏电站大坝右岸洞室开挖过程控制及对策
12.
Lighting Design for Xiluo Ferry Hydropower Station Cavity Construction
溪洛渡水电站右岸泄洪洞施工照明设计
13.
Smooth blasting technology for flood discharge tunnel of Xiluodu Hydropower Station on right bank
溪洛渡水电站右岸泄洪洞光面爆破技术
14.
The river banks were hollowed out by rushing water.
河岸由于流水冲刷而成空洞。
15.
The currents run at approximately 1.5 knots along the northern shore.
沿北岸的潮流速度为1.5海里/小时左右。
16.
The Stability Analysis of High-rock Slope on the Right Bank Spillway Tunnel of Luding Hydroelectric Station;
泸定水电站右岸泄洪洞出口边坡稳定性数值分析
17.
Analysis of the Causes of Axial Cracks in Right-bank of the Three Gorges Hydropower Station;
三峡工程右岸地下厂房引水洞衬砌混凝土轴向裂缝成因分析
18.
The Installation and Test of the Hydraulic Turbine Guide Bearing of Three Gorges Right Bank Power Station
三峡右岸机组水导轴承安装及调试特点