1.
Water Guiding Tunnel Slope Stability Analysis in Right Bank in JinChuan Hydro-power Station;
金川水电站右岸导流洞进水口边坡稳定性评价
2.
Construction Technology for Transition Section of Diversion Tunnel at Left Bank of Guandi Hydropower Station
官地水电站右岸导流洞进口渐变段施工技术
3.
Study on Stability of the Quasi-bedded and Counter-tilt Rock Slope in Right Bank Diversion Tunnel Inlets of Nuozhadu Hydropower Station;
糯扎渡水电站右岸导流洞进口似层状反倾岩质边坡稳定性研究
4.
Blasting Demolition Technology of Cofferdam at the Entrance and Exit of Right Diversion Tunnel in Jinping Stage I Hydropower Station
锦屏一级水电站右岸导流洞进出口围堰爆破拆除安全技术
5.
FEM CALCULATION OF HIGH INLET SLOPE OF DIVERSION TUNNEL ON RIGHT BANK OF CHANGHEBA HYDROPOWER STATION
长河坝水电站右岸导流隧洞进口高边坡稳定性有限元计算分析
6.
Three Gorges Right Bank First-stage River Diversion Concrete Dam Body Joint Grouting
![点击朗读](/dictall/images/read.gif)
三峡右岸一期导流工程混凝土坝体接缝灌浆
7.
Slope Stability Analysis and Countermeasures of Intake Diversion Tunnel at the Left Bank of Longtan Hydropower Station;
龙滩电站左岸导流洞进水口边坡稳定分析及防治对策
8.
The Risk and Scheme Analyses of Fast Implementing in the Project of the Left Export Hole at LongTan Hydropower Station;
龙滩水电站左岸导流洞工程快速施工风险及方案分析
9.
Analysis of the Stability of the Slope of the Outlet Section of Spillway Tunnel of Luding Hydropower Station;
泸定水电站右岸泄洪洞出口边坡稳定性研究
10.
Analysis and Research on the Scheme of Right-bank Flood Discharge Grotto in GongBoXia Hydro-power Station;
公伯峡水电站右岸泄洪洞方案分析及研究
11.
Process Control and Countermeasures to Cavern Excavation in Right Bank of Jinping Hydropower Station Dam
锦屏电站大坝右岸洞室开挖过程控制及对策
12.
Lighting Design for Xiluo Ferry Hydropower Station Cavity Construction
![点击朗读](/dictall/images/read.gif)
溪洛渡水电站右岸泄洪洞施工照明设计
13.
Smooth blasting technology for flood discharge tunnel of Xiluodu Hydropower Station on right bank
溪洛渡水电站右岸泄洪洞光面爆破技术
14.
The river banks were hollowed out by rushing water.
![点击朗读](/dictall/images/read.gif)
河岸由于流水冲刷而成空洞。
15.
The currents run at approximately 1.5 knots along the northern shore.
![点击朗读](/dictall/images/read.gif)
沿北岸的潮流速度为1.5海里/小时左右。
16.
The Stability Analysis of High-rock Slope on the Right Bank Spillway Tunnel of Luding Hydroelectric Station;
泸定水电站右岸泄洪洞出口边坡稳定性数值分析
17.
Analysis of the Causes of Axial Cracks in Right-bank of the Three Gorges Hydropower Station;
三峡工程右岸地下厂房引水洞衬砌混凝土轴向裂缝成因分析
18.
The Installation and Test of the Hydraulic Turbine Guide Bearing of Three Gorges Right Bank Power Station
三峡右岸机组水导轴承安装及调试特点