说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 闸首
1.
Application of Strengthened Anchor Cable in Gate Monoliths of Permanent Navigation Lock
加固锚索在永久船闸闸首支持体中的运用
2.
The Non-Linear Finite Element Analysis of Navigation Lock-head Structure with the Application of Biot s Consolidation Theory;
应用Biot固结理论的船闸闸首结构非线性有限元分析
3.
Application of VB and TrueGRID to 3D finite grid automatic mesh generation for lock head
VB与TrueGRID软件在船闸闸首三维有限元网格自动剖分中的应用
4.
In combination with the construction practice of Xinba Lock, this paper introduces culvert construction of tile Lock's upper lock head and preventive measures for cracks.
通过新坝船闸施工实践,介绍了船闸上闸首输水廊道施工及预防裂缝产生所采取的措施。
5.
Study on Stress of Intake Head in Ski-jump Spillway of Arch Dam
拱坝滑雪道式溢洪道进口闸首的应力研究
6.
Research on the Static & Dynamic Analysis of Stress-deformation and Anti-sliding Stability of the Upper Lock Head of Tingzikou Hydropower Station
亭子口水电站上闸首应力变形与抗滑稳定静动力分析研究
7.
The blasting parameter calculation of the technology is analyzed with the discussion on the rock excavation of the first foundation in next floodgate of Bailongtan hydroelectric power station.
结合百龙滩水电站下闸首基础石方开挖工程,详细介绍了该技术的爆破参数计算。
8.
head gate structure [irrigation]
渠首闸门,总水闸门[灌溉]
9.
Navigation through permanent ship locks and operation of the first group of generators will begin in 2003.
2003年实现永久船闸通航和首批机组发电
10.
Study of BeiyinQushou Sluice Scheme Optimization in Northern Nenjiang Water Transfer Key Project
引嫩骨干工程北引渠首泄洪闸方案优选研究
11.
Multi-objective and multiple fuzzy optimization of sluice scheme in north conveyance canal head
北引渠首泄洪闸方案的多目标多级模糊优选
12.
Analysis on Numerical Simulation and Investigation of Reinforcement Method of New-old-structure Interfaces in Gate Engineering;
渠首加闸工程新旧坝体结合面数值仿真分析与加固措施研究
13.
Foundation Treatment Experimental Study of Canal Head Sluice in Xinjiang Yarkant River Basin
新疆叶尔羌河流域中游渠首水闸基础处理试验研究
14.
At first, without regard to temperature, calculate structure's stress and look for the reason of crack.
首先在不考虑温度荷载的情况下,对闸墩进行结构计算,探求裂缝出现的原因。
15.
This system had been applied to strobe engineering of tongjiyan and run well.
该系统已经在通济堰渠首取水工程闸门工程中投入使用,取得了良好的运行效果。
16.
The lock keeper closed the lock gate.
船闸管理员关上了闸门。
17.
Piers and Bottom Board Temperature Control Design of Gate Piers and Bottom Board of Spillway Water Gates for Yanshan Reservoir
燕山水库溢洪道水闸闸墩和闸底板温控设计
18.
"Thyratron glow(starting "on"state, ignition)"
闸流管连通(失控)