1.
The Construction Craft at 0 #~1 # Node Section of Box Continuous Beam
箱形连续梁0~1~#节段施工工艺
2.
Study on Mechanical Behavior and Cable Force of Segment Construction External Prestressing Bridge;
节段施工体外预应力桥梁力学性能及索力分析
3.
Studies on Mechanical Behavior of Segmental Bridge with External Tendon and Development of OOP;
节段施工体外预应力桥梁力学性能研究及面向对象的程序设计
4.
Review of Segmental Assembling Construction Technique of Mobile Support
移动支架节段拼装施工技术方法综述
5.
On quality control of inspection engineers over architectural energy-saving at construction stage
监理工程师在施工阶段对建筑节能的质量控制
6.
A Study of Key Links in Implementation Phase Cost Control of Construction Engineering;
建设工程实施阶段造价控制关键环节研究
7.
On three key links of construction cost management in the implementation stage of a construction project;
论建设工程实施阶段造价管理的三个关键环节
8.
Construction technology of box-girder segment bricolage of traversing carriage bridge fabrication machine
移动支架造桥机箱梁节段拼装施工技术
9.
Segment bracket method construction of V-shape structure tied girder of Xiaolan super-large Bridge
小榄特大桥V构系梁节段支架法施工技术
10.
Prefabricated Construction Technology of Matched Short-Molding Method for 60m Segmental Box Girder of Shanghai Yangtze River Tunnel-Bridge
上海长江隧桥60m节段梁短线法匹配预制施工工艺
11.
Method and technique of segmental prefabrication, transfer gantry hoisting, splicing on arch timbering in construction of Xinyang Shihe River Bridge are introduced.
介绍信阳狮河大桥采用节段预制,龙门桁车提运,拱架上拼装等施工方法和施工工艺。
12.
Cable installation for reinforced concrete box arch bridge of Liuguihe large Bridge
六圭河大桥钢筋混凝土箱形拱桥多节段缆索吊拼装施工技术
13.
Study on Construction Technology for Pre-fabricated Segmental Box Girder Cantilever Erection in Shanghai Yangtze River Tunnel-Bridge Section B6
上海长江隧桥B6标预制节段箱梁悬臂拼装施工技术研究
14.
The application of steam curing process for precast segmental beams of Humin Elevated Project has increased the early strength of concrete and met the requirements of construction progress.
沪闵高架工程预制节段梁采用蒸汽养护的工艺,使混凝土早期强度增长,满足了施工进度要求。
15.
The risk prevention measures in engineering bidding and construction period;
工程投标及施工阶段的风险防范措施
16.
Applying value engineering in the construction stage of project;
工程项目施工阶段价值工程应用研究
17.
The construction technology of Pengxi river cable stayed bridge side span cast-in-place section and closure section
彭溪河斜拉桥边跨现浇段及合龙段施工工艺
18.
Monitoring control of cost and progress in the stage of construction for the project item
工程项目施工阶段进度与成本的监控