说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 站后工程
1.
The Project Management on the 3th Biding of the Last Part Station Construction of Jin-Jun Railway;
金筠铁路站后工程第Ⅲ标段施工管理
2.
Appraisal on Supervision Work of Arch Dam Works of Ertan Hydropower Project;
二滩水电站拱坝工程监理工作后评估
3.
Hydro-power Project of First Level in Pingnan, Fujian Province;
福建省屏南县后垄溪一级水电站工程
4.
Environment Influence Analysis on Back Square Transithub of Tianjin Railway Station;
天津站后广场交通枢纽工程环境影响分析
5.
Construction Scheme of Subsequent Project of Cascade Hydropower Station in Songjianghe;
松江河梯级水电站后续工程建设方案探讨
6.
Waterproofing technology in underground structure of Tianjin Railway Station Back Square
天津站交通枢纽后广场工程地下结构防水技术
7.
The program could not connect to the workspace. Please contact your site administrator, or try again later.
该程序无法连接到工作区。请与网站管理员联系,或稍后再试。
8.
The Geological Evaluation of the Rock Mass Engineering after the Excavation of the Spandrel Trough between the Banks of Xi Luo Du Hydropower Station;
溪洛渡水电站高拱坝两岸拱肩槽开挖后岩体工程地质评价
9.
Construction points of glass curtain walls in central station buildingof Beijing Southern Station
北京南站中央站房玻璃幕墙工程施工要点
10.
Specification for engineering acceptance of hydropower station capital construction
水电站基本建设工程验收规程
11.
Technical specification for automotive rinsing station engineerings
机动车清洗站工程技术规程
12.
Study on Whole Course Cost Management for Nuclear Power Construction Project;
核电站工程项目全过程成本管理研究
13.
Engineering Workstation--Hardware and Software ?
工程工作站一硬件与软件设计
14.
Analysis of the Influences of Engineering Legislations on the Construction Cost of Subway Station
工法对地铁车站工程造价的影响分析
15.
Construction Quality Management of Nanyangxi 500 kV Substation
南阳西500kV变电站工程施工质量管理
16.
Application of a New Tubular Roof Method in Excavation Work of a Subway Station
NTR工法在地铁暗挖车站工程中的应用
17.
To Apply PcAnywhere to Remotely Control the Monitoring Station of the Substation
应用PcAnywhere实现远程控制变电站监控工作站
18.
Study and application of a railway station building engineering fiber concrete
某火车站站房工程纤维混凝土的研究与应用