1.
Structure Analysis and Research on the Emergency Track Girder of Chongqing Light Railway;
重庆轻轨应急轨道梁结构分析与研究
2.
Research on Design of the 40.5 m Steel Track Girder for Line 2 of Chongqing Light Rail
重庆轻轨2号线40.5m钢轨道梁设计研究
3.
Experimental study on the Dynamic Characteristics of PC beam in Chongqing light rail project
重庆轻轨PC梁动力特性的试验研究
4.
Development and Application of Carrying and Erecting Device of PC Track Beam in Chongqing Light Rail
重庆轻轨PC轨道梁架运设备的研制和应用
5.
Tunnel Informatization Construction on Geleshan Mountain Tunnel and Daping Light Railway in Chongqing City;
歌乐山隧道与重庆轻轨大坪隧道的信息化施工
6.
The Analysis and Design of the Hydraulic System of the Change-wheel Garage on Chongqing Light Rail;
重庆轻轨换轮库液压系统的设计与分析
7.
Analysis and Strategy for Insecurity Factors in No.2 Line of Chongqing Light Rail Transit;
重庆轻轨二号线运营不安全因素分析及对策
8.
Management Pattern of System Commissioning for Light Rail Equipment in Chongqing
重庆轻轨工程设备系统调试的管理模式
9.
Analysis of Adaptability Based on Monorail Traffic Structural Type of Chongqing Light Rail Line 2
基于重庆轻轨2号线的单轨交通结构形式适应性分析
10.
Study of Key Construction Technology of Extra Large-Span Flat and Shallow-Buried Daping Station Tunnel in Chongqing Light-Rail Project;
重庆轻轨特大跨超浅埋扁平车站隧道关键施工技术研究
11.
Application of Highway & Railway Quota in Bidding for the Erection of Chongqing Light Track PC Track-beam;
公路和铁路定额在重庆轻轨PC梁架设工程投标中的应用
12.
Application of Highway Quota to Bidding for the Erection of Chongqing Light Track PC Track-beam;
公路定额在重庆轻轨PC梁架设工程投标中的应用
13.
Application and Durability Research of HSC and HPC used in Casting-in-Place Inverted T-Beam in Light Rail Project of Chongqing
重庆轻轨现浇倒T型梁高强、高性能混凝土应用与耐久性研究
14.
Investigation of Launching Technique for the PC Beam of the Overhead Light Railway in Chongqing City;
重庆城市高架轻轨PC梁架设技术研究
15.
Idea of Green Light Rail Reflected and Developed in Chongqing Rail Transit
“绿色轻轨”理念在重庆轨道交通的体现和延伸
16.
(4) Elevated light railway in Chongqing (phase I of light trunk from Jiaochangkou to Xinshancun)
4.重庆市高架轻轨交通(较场口-新山村线路一期工程)
17.
ENGINEERING GEOLOGICAL RESEARCH ON THE LAYOUT DEPTH OF LIGHT RAIL LINE 1 IN CHONGQING CITY
重庆市轻轨一号线工程埋置深度的工程地质研究
18.
The Research on Prestressed System s Durability of PC Track Beam in Chongqing Monorail Transportation;
重庆单轨交通PC轨道梁预应力体系耐久性研究