说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 红石水电站
1.
Profit analysis of the tailrace dredging at Hongshi hydropower station
红石水电站发电尾水河床清挖工程效益分析
2.
Test Research on Hydraulic Stability of 4# Hydraulic Turbine at Hongshi Hydropower Station
红石水电站4#水轮机水力稳定性的试验研究
3.
Peculiarity of rockfill dam with clay core design at Lianhua hydropower station
莲花水电站粘土心墙堆石坝设计特点
4.
Rockfill dam with face slab construction of Lianhua water power station
莲花水电站面板堆石坝坝体填筑施工
5.
Optimal Study on Cooperating Operation for Hydropower Stations of Siquan and Xihe River;
石泉、喜河水电站联合优化调度研究
6.
Studies on Geohazards of Reservoir Banks of Jishi Valley Hydropower Station, Huanghe River;
黄河积石峡水电站库岸地质灾害研究
7.
Technical Alteration of the CT-40 Mechanical Hydraulic Governor in the Shitouhe Hydropower Station;
石头河水电站CT-40型调速器技术改造
8.
Primary Analysis of the Rear Slope Stability of Shimenkan Hydropower House
石门坎水电站厂房后边坡稳定性初判
9.
Anti-seepage construction of earth-rockfill cofferdam for Yinpan Hydropower Station
银盘水电站土石围堰防渗施工及评价
10.
Excavation and Construction of Extra Large Caverns at Longtoushi Hydropower Station
龙头石水电站特大洞室开挖施工技术
11.
Construction of impervious wall in CFRD of Laodukou Hydropower Station
老渡口水电站面板堆石坝防渗墙施工
12.
Influence of Pushihe flood to tail water level of taipingwan hydropower station
蒲石河洪水对太平湾水电站尾水位的影响
13.
On optimization scheme for stone powder recovery in artificial aggregate system in some hydropower house
某水电站厂房人工砂石系统石粉回收优化方案
14.
APPLICATION OF VIBRO REPLACEMENT STONE COLUMN IN LONGTOUSHI DAM CREST REINFORCEMENT
振冲碎石桩在龙头石水电站坝基加固中的应用
15.
EXPERIMENTAL STUDY ON SHAFT SPILLWAY HYDRAULIC CHARACTERISTICS OF DA SHI MEN HYDROPOWER
大石门水电站竖井式溢洪道水力特性试验研究
16.
3D numerical simulation of overtopping flow field for earth-rockfill cofferdam of Silin hydropower station
思林水电站土石围堰过水流场三维数值模拟
17.
Application of high-pressure water test in Pushihe pumped storage power station
高压压水试验在蒲石河抽水蓄能电站中的应用
18.
Influence of flood from Pushi river on flood discharge of Taipingwan hydropower station
蒲石河洪水对太平湾水电站泄洪的影响