1.
Design and Construction of Bracket at Block 0 of Jialing River Extra Large Rigid Frame Bridge for Chongqing Monorail Line 3
重庆轨道交通3号线嘉陵江特大刚构桥0号块托架设计及施工
2.
Design of the streamlined cab of the railway car running in line No.3 of Dalian high-speed railway traffic
大连市快速轨道交通3号线车辆流线型司机室设计
3.
The Plug Doors for Vehicles for the Express Rail Traffic No.3 Line in Dalian and the Optimization of the Assembly and Trial Operation Technology
大连市快速轨道交通3号线车辆塞拉门及其组装调试工艺的优化
4.
The northern extension of Metro Line 3 began operating last Monday.
轨道交通3号线的北延伸段已于本周一投入营运。
5.
Design and Construction of Concrete-filled Steel Tube Arch Bridge over Suzhou Creek
上海轨道交通3号线跨苏州河钢管混凝土拱桥设计与施工
6.
Key Technology of the Northern Extended Section of Shanghai Rail Transit Line 3
上海轨道交通3号线北延伸工程浅埋段斜穿富锦路关键技术
7.
Solution for Faults of Vehicle Resistance Braking in Dalian Rapid Rail Transit Line 3
大连快速轨道交通3号线车辆电阻制动故障解决
8.
Box Culvert Jacking Technology for Northern Extended Section of Shanghai Metro Line 3 through Bao Steel's Special Railway Line
上海轨道交通3号线北延伸工程穿越宝钢铁路专用线的箱涵顶进技术
9.
Operational Modes of Shanghai UMT Line 3 & Line 4
上海轨道交通3、4号线的运营模式
10.
Welcome to take rail transit line No. 5.
乘客您好,欢迎乘坐轨道交通5号线。
11.
Operation Organization of Shanghai Rail Transit Line No. 2;
上海市轨道交通2号线运营组织探讨
12.
ATC System in North Extension of Shanghai Metro Line 1
上海轨道交通1号线北延伸段ATC系统
13.
Preliminary Exploration of Long and Short Routing Operation Mode in Shenyang Rail Transit Line 1
沈阳轨道交通1号线大小交路运行模式初探
14.
Analysis of Loop Line Operation Mode for Shanghai Metro Line 4
上海轨道交通4号线环线运营组织实践分析
15.
Preliminary Study of Maintenance Management System of Rail Beam Bridge in Chongqing Monorail Transit Line 2;
重庆轨道交通2号线轨道梁桥养护管理系统初步研究
16.
Application of Risk Management on Metro Line No.10 in Shanghai;
风险管理在上海轨道交通10号线工程中的应用
17.
Analysis of the Characteristics of Passenger Flow of station on Shanghai Rail Tr ansit Line 5;
上海轨道交通5号线站点客流特征分析
18.
Financial Influence of Transfer Station Construction on Rail Transit Line 6;
换乘站建设对轨道交通6号线财务分析的影响