1.
Practice of Electrical Transformation of Flame-cutting Machine for Slab Continuous Casting
板坯连铸火焰切割机的电气改造实践
2.
Analyzing for Technical Reforming Electric System of B1 Packing Unit in Cigrarette Factory;
卷烟厂B1包装机组电气改造技术应用分析
3.
The Application of PLC in the Electric Transformation of Thyristors Series SR System;
PLC在晶闸管串级调速系统电气改造中的应用
4.
Modification of JAT600 Air-jet Loom Electrical System
JAT600型喷气织机电气系统的改造
5.
Electric Circuit Reformation of the Hydraulic Pressure Semiautomatic Lathe
液压半自动车床电气控制电路的改造
6.
The Technical Reformation of Electric Control System of GF Air Impact Moulding Line
GF气冲造型线电气控制系统的技术改造
7.
* Gaojing Power Plant is switched to gas-fired generation, reducing 1.50 million tons of coal;
高井电厂燃气改造,减煤150万吨。
8.
The Track Construction Technology Research of the Speed Increase Improvement in Zhegan Line;
浙赣线电气化提速改造施工技术研究
9.
Transformation of electrical control system in pressure filter 1060
1060型压滤机电气控制系统的改造
10.
Modification of electric control system for 100 "vulcanizer
100"硫化机电气控制系统的改造
11.
Numerical Control Transformation of the Electrical System of X5032 Milling Machine
X5032型铣床电气系统的数控化改造
12.
Transform and Application of the Vertical Level Grinding Machine's Electrical Control System
立式平面磨床电气系统的改造与应用
13.
Reform of M7475 Grinding Machine's Electrical Control System Using PLC
基于PLC的M7475磨床电气控制系统改造
14.
Modif ication of electric power transducer for Φ200 tube extrusion line
内胎φ200挤出生产线电气动力变频改造
15.
energy supply for space heating is 2.70 million tce, taking 6.5% of the final energy consumption;
高井电厂改造燃气发电,削减燃煤量150万吨;
16.
Frequency-changing Reformation of Electrical System in MG400/980-WD Electromagnetism Timing Coal Cutter
MG400/980-WD型电磁调速采煤机电气系统变频改造
17.
Air-preheater Conversion for No. 8 Boiler in Guodian Jianbi Power Plant
国电谏壁发电厂8号炉空气预热器改造
18.
Plan for Improvement of OCS of High Speed Electrified Railways in China
我国高速电气化铁路接触网改造方案的设想