说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 深圳地铁一期工程
1.
TRB mode analysis of metro vehicles in Shenzhen Metro Phase 1
深圳地铁一期工程地铁车辆TRB模式分析
2.
It is mainly introduced the protection configuration and the concerted relationship for the power supply system of Shenzhen metro vehicles at the 1(superscript st) stage.
主要介绍了深圳地铁一期工程牵引供电系统保护配置及配合关系。
3.
Proposals of Home-manufactured Vehicles, Mechanical & Electric Equipment in Shenzhen Metro;
深圳地铁一期工程车辆及机电设备国产化方案探讨
4.
A probe into auditing methods of working plan budget of civil worksfor Shenzhen Metro Phase 1;
关于深圳地铁一期土建工程施工图预算审计方法的探讨
5.
Study on Dichophase Project Financing Mode of Shenzhen Metro Line 4;
深圳地铁4号线二期工程项目融资模式研究
6.
Design of auxiliary system for Shenzhen Metro Line 1 extension
深圳地铁1号线续建工程车辆辅助系统设计
7.
Indoor room air quality in waitingroom of Shenzhen railway station
深圳市一期地铁站厅室内空气质量分析
8.
The Discussion of Rational Eexploitation Strength in the Plot around the Metro Station: Start ing with the Detailed Plan of Rail Transport in Second Phase in Shenzhen;
地铁车站周边地块合理开发强度之初探——由深圳市轨道交通二期工程详细规划说起
9.
Discussing the Frequent Engineerin Geologic Problem & Countermeasure in Shenzhen Subway Engineering Investigation
深圳地铁工程勘察常见工程地质问题与对策初探
10.
Detailed Exploration for Geotechnical Engineering of Qianhaiwan Station in Construction of Continued Project of Shenzhen Subway Line 1
深圳地铁1号线续建工程前海湾站岩土工程详细勘察
11.
Application of vacuum preloading technique to Shenzhen River regulation
真空预压技术在治理深圳河一期工程中的应用
12.
Study on Construction Method and Whole Structure Design in No .1 Line of Shenzhen Extend Metro;
深圳地铁1号线续建工程总体结构设计土建工法研究
13.
Reliability of Multifunctional Vehicle Bus for Shenzhen Metro Line 1
深圳地铁1号线续建工程多功能车辆总线网络系统的可靠性分析
14.
Carbody Design for Shenzhen Metro Line 1 Expanding Engineering
深圳地铁1号线续建工程铝合金全焊接鼓形车体研制
15.
Decision of ATC-antenna fitting mode for Shenzhen Metro Line 1 extension
深圳地铁1号线续建工程车辆ATC天线安装方式的确定
16.
On Shield Method Construction Techniques of Shenzhen Metro Crossing-railway Interval Tunnel
深圳地铁穿越铁路的区间隧道盾构法施工技术
17.
Construction and cost analysis of underground continuous wall beneath Fumin station of Shenzhen Metro;
深圳地铁福民站地下连续墙施工及成本分析
18.
Construction of Underground Diaphragm Wall in HUAXIN Station of SHENZHEN Metro
浅谈深圳地铁华新站地下连续墙施工技术