说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 钢梁制造
1.
SOME PROBLEMS ON TMCP STEEL BEAM DURING MANUFACTURE
TMCP钢在钢梁制造中应注意的问题
2.
Technology Research for Steel Box Girder Fabrication and Preassembly of E Dong Yangtze River Bridge
鄂东大桥钢箱梁梁段制造及预拼装技术研究
3.
The web and flanges of the main girders were fabricated from ASTM A441 steel.
主梁的腹板和翼缘用ASTM A441钢制造。
4.
New steel box beam fabrication technology in the main bridge in the Yangtse River Bridge in Anqing
安庆长江公路大桥主桥钢箱梁制造新工艺
5.
Research of 1 770 MPa galvanized steel wire for stay cable of domestic bridges
国产桥梁斜拉索用1770MPa镀锌钢丝制造技术的研究
6.
Manufacturing Techniques for Steel Box Girder of Ji′nan Huanghe River Bridge on Qingdao-Yinchuan Expressway
青银高速公路济南黄河大桥钢箱梁制造技术
7.
THE DISCUSSION ON STRUCTURE AND APPLICATION OF REINFORCED CONCRETE FRAME COLUMN-BEAM JOINT UNDER THE ICONOGRAPHICAL RULES
在平法制图规则下钢筋混凝土框架柱梁节点梁钢筋构造及应用探讨
8.
Diaphragm Fabrication and Accuracy Control of Sutong Yangtze Highway Bridge Steel Box Girder
苏通长江公路大桥钢箱梁横隔板制造及精度控制
9.
Steel construction consisting of steel beams, columns, and trusses is extensively used for high buildings.
钢构造由钢梁、钢柱和钢桁梁组成.被广泛应用于高层建筑。
10.
Exploration of erection technique and cost of large span steel trussed arch girders;
大跨度钢桁拱梁架设技术与造价探讨
11.
A SIMPLIFIED CALCULATION METHOD AND STRUCTURE MEASURES OF ANTI-TORSION STEEL BEAM
钢梁抗扭转简化计算方法和构造措施
12.
Manufacturing execution system (MES) is a driving power of informationalization for steel companies and an important bridge between production automatization and management information.
制造执行系统是钢铁企业信息化建设的推动力,是生产自动化与管理信息化之间的重要桥梁。
13.
This paper gives an introduction to the structural features and manufacture scheme of the steel box girder for Anshan Bridge, as well as the necessary measures adopted to assure the quality of the products.
介绍鞍山桥钢箱梁的结构特点和制造方案,以及为保证产品质量所采取的必要手段和措施。
14.
bridge section (i.e., parts of structures) of iron or steel
铁或钢制铝制桥梁部件(即结构零件)
15.
The Research on Construction Control in the Incremental Launching of Main Girder of Cable-stayed Bridge with Steel Box Girder
钢箱梁斜拉桥主梁顶推法施工阶段控制研究
16.
Study on "Strong Column-Weak Beam" Failure Mode of Composite Frame Composed of SRC Columns and Steel Beams
SRC柱-钢梁组合框架“强柱弱梁”破坏机制研究
17.
STEEL BOX BEAM INTEGRAL ERECTION MAKE USE OF TRANSFORMING SUSPEND-BASKET FORMING BOMMS
利用挂篮改制成的吊梁实现钢箱梁整体安装
18.
the place where iron is smelted or where iron goods are made.
锻造钢铁或制造钢铁产品的地方。