1.
Analysis for the Stator Winding Fault Types of the Three Gorges Generators and Design for Their Physical Simulator;
三峡机组的绕组故障形式分析及物理模拟
2.
Development and application of condition monitoring and trend analysis systems of Three Gorges units
三峡机组状态监测趋势分析系统的开发与运用
3.
The technical alternatives for installation ofthe units should be optimized so that the Three Gorges power station can be put into operation asearly as possible.
因此,必须优化三峡机组安装的技术方案,使其尽早投产发电。
4.
Domestic Manufacture of Three Gorges Power Station 700 MW Hydro-generating Unit
三峡电站700MW水轮发电机组国产化实践
5.
Analysis of VGS Unit Thrust Bearing for Three Gorges Left-bank Power-plant
三峡左岸电站VGS机组推力轴承分析
6.
Application of positioning technology to ALSTOM generator set installation in Three Gorges hydropower station
三峡电站ALSTOM发电机组定位技术方案
7.
Embedment of spiral cases of 700MW hydro-generator set Three Gorges Hydropower Plant(Ⅲ-phase)
三峡三期水电厂700MW机组蜗壳埋设施工技术
8.
Development of Mica Tape of Application on Three Gorge Hydrogenerator;
应用于三峡水轮电机机组上的粉云母带的研制
9.
Study on Mechanical and Electrical Vibration of Hydraulic Generator Set in Three Gorges;
三峡水轮发电机组机电耦联振荡的研究
10.
Summary on the start-up debugging and trial operation of the first generating units of Three Gorges Hydropower Plant
三峡电站首批机组的起动调试及试运行
11.
Study on Stator Fault Modalities and Main Protection Schemes of the Three Gorges Right Bank Generators;
三峡右岸机组定子故障形式及主保护方案研究
12.
Simulation and Analysis of Generator Excitation System for Three Gorges Power Plant;
三峡电厂发电机组励磁系统的仿真分析与研究
13.
Adjusting Technique for the General Assembly of Three Gorges Super-huge Turbogenerator
三峡特大型水轮发电机组总装调整技术
14.
Influence of Negative Discharge on Vibration of ALSTOM Units on the Left Bank of the Three Gorges Hydropower Station
负流量对三峡左岸电站ALSTOM机组振动的影响
15.
Technical Reform for Technical Water Supply System of the Three Gorges Power Supply Station
三峡电源电站机组技术供水系统技术改造
16.
Manufacture of Three Gorges hydro power generating unit is a typical example of successful importation of technology
三峡水轮发电机组制造是技术引进成功的范例
17.
Characteristics Analysis of the Unit's Governing System of the Three Gorges Power Source Station
三峡电源电站机组调速系统的特点分析
18.
The Installation and Test of the Hydraulic Turbine Guide Bearing of Three Gorges Right Bank Power Station
三峡右岸机组水导轴承安装及调试特点