说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 进洞技术
1.
Research on holing through technique of the shield machine on the ⑤_2 level geological condition
盾构机在⑤_2层地质条件下进洞技术的研究
2.
On entering the red likepowder sand brick with high water tunnel safely
富水砖红色粉质砂土隧道安全进洞技术
3.
Construction Techniques for the Inlet Section of the New Wanshansi Railway Tunnel
新万山寺铁路隧道进口段进洞施工技术
4.
Technology Research of Reinforcement at the Getting Into Shaft on the Shield Tunnel Construction Method on Soft Clay Region
软土地区盾构法施工进洞加固技术研究
5.
Progress of design theory and safe operation technology for diversion tunnels
施工导流隧洞设计理论与安全运行技术进展
6.
Construction Technology for Transition Section of Diversion Tunnel at Left Bank of Guandi Hydropower Station
官地水电站右岸导流洞进口渐变段施工技术
7.
Construction Technology of Launching and Arriving for Shield Tunnelling in Complex Geology
盾构在复杂地质条件下的进出洞施工技术
8.
Construction Techniques for Double-layer Undermining Entering Hole in the Subway Main Body
地铁车站主体双层暗挖段进洞施工技术
9.
Comprehensive entering into tunnel construction technology of large section weak surrounding rock tunnel
大断面软弱围岩隧道综合进洞施工技术
10.
Study on the Zero Excavation Tunnel-entering Construction Technique for the Highway Tunnel in the Scenic Spot
风景区公路隧道“零开挖”进洞施工技术研究
11.
High Slope Anchorage at Diversion Tunnel Inlet of Shenxigou Hydropower Station
深溪沟水电站导流洞进口高边坡锚固技术研究
12.
Vulnerability Attack and Defense and Vulnerability Database Design;
漏洞攻击防范技术与漏洞数据库设计
13.
An appraisal of the advances in wind tunnel test techniques can be readily obtained by comparing the modern wind tunnel facilities with their historical predecessors.
将现代风洞设备同其历史上的先驱相比较,很容易对风洞试验技术的进展情况作出评价来。
14.
It takes more skill than it looks to knock the ball into the hole.
要把球打进洞里看起来算不了什么, 其实很需要技术。
15.
Research on Construction Technique and Mechanism of Reinforced Soil for Departure and Reception of Large Scale Shield;
大型盾构进出洞施工技术及加固土体受力机理分析
16.
Thermal Effect Simulation and Analysis of Tunnel Lining during Construction with Object-Oriented Programming;
采用面向对象技术进行隧洞衬砌施工期温变效应仿真分析
17.
Study on Technology System of Zero Cave-entrance and Its Application of Large Cross-section Tunnel under Complex Geological Conditions
复杂地质条件下大断面隧道“零”进洞工法技术体系及应用研究
18.
Technology Research and Application of Fixing and Removable of Cutterhead TB880E-type TBM the Tunnel
TB880E型掘进机刀盘洞内固定和拆装技术研究与应用