说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 瀑布沟水电站
1.
Test of Surrounding Concrete of Steel Spiral Case Keeping Constant Internal Water Pressure in Pubugou Hydropower Station
瀑布沟水电站充水保压蜗壳结构模型试验
2.
Surrounding Rock Mass Classification of Underground Power House at Pubugou Hydroelectric Power Station on Dadu River;
大渡河瀑布沟水电站地下厂房围岩分类研究
3.
Gravel-soil screening-conveying system for construction of Pubugou Hydropower Station
瀑布沟水电站施工砾石土筛分输送系统设计
4.
Design and improvement of filter material processing system for construction of Pubugou Hydropower Station
瀑布沟水电站反滤料加工系统的设计与改进
5.
Analysis on construction monitoring of gravel-soil core of rock fill dam of Pubugou Hydropower Station
瀑布沟水电站大坝砾石土心墙施工监测分析
6.
Construction quality control of dam foundation overburden in Pubugou hydropower station
瀑布沟水电站坝基覆盖层施工质量控制
7.
Study on Stability Evaluation and Support Methods of the Kaergou High Steep Slope for Pubugou Hydroelectric Power Station
瀑布沟水电站卡尔沟料场高陡边坡稳定性评价及支护对策研究
8.
On Importance for Construction of Pubugou Hydropower Station From View of Implementation of Interconnection of Networks and West-to-East Power Transmission Project;
从实施电网互联西电东送战略谈兴建瀑布沟水电站的重要性
9.
Static and Dynamic Analysis of the Outlet High Slope of the Tailrace Tunnel of Pubugou Hydropower Station;
瀑布沟水电站尾水隧洞出口高边坡静动力稳定性三维有限元分析
10.
To construct this hydropower station is a new milestone in the cascade development of Dadu River.
瀑布沟水电站的开工建设是大渡河梯级开发的一个新的里程碑。
11.
Construction of Pubugou Hydropower Project on Dadu River Adapt to Advanced Productivity Development
建设与先进生产力发展要求相适应的大渡河瀑布沟水电站工程
12.
Stability Analysis on Side Slope in the Spillway Chute Pubugou Hydroelectric Power Station under Different Function of Releasing Floodwater;
大渡河瀑布沟水电站溢洪道陡槽段雾化边坡稳定性研究
13.
Stability Analysis of Surrounding Rock and Optimization of Supporting Structure in Pubugou Hydropower Station Diversion Tunnels;
瀑布沟水电站导流洞围岩稳定性与支护结构优化分析
14.
Application of Gray System Theory in Discharge Tunnel Schedule Control at Pubugou Hydropower Station;
灰色系统理论在瀑布沟水电站泄洪洞工程进度控制中的运用
15.
Deformation and Stability Analysis of Outlet Section of the Discharge Tunnel of Pubuguo Hydropower Station;
瀑布沟水电站泄洪洞出口段开挖变形及稳定性非线性有限元分析
16.
Stablity Monitoring and Back Analysis of Displacement of Rockmasses Surrounding the Emptying Tunel in Pubugou Hydropower Project
瀑布沟水电站放空洞围岩的稳定性监测与位移反分析研究
17.
Comprehensive Treatment of Side Slope in Highway of Pubugou Hydropower Station Submerging Area
瀑布沟水电站淹没区右岸公路边坡综合治理技术
18.
The Shenqidi Debris Flow s Development Character and Prevention Countermeasure Pubugou Power Station, Dadu River;
大渡河瀑布沟水电站坝址左岸深启低沟泥石流发育特征及防治研究