说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 小湾坝肩槽
1.
Analysis of Unloading Characters Due to Excavating Abutment High Slope Using Three-dimensional Nonlinear Finite Element Method and Study on Reinforcement Measurements in Xiaowan;
小湾坝肩槽开挖高边坡卸荷特性三维非线性有限元分析及加固措施研究
2.
Effects of seismic residual deformation of abutment rock on safety of Xiaowan arch dam
坝肩岩体地震残余变形对小湾拱坝安全度影响
3.
Research on Xiaowan Arch Dam s Abutment Stability and Reinforcing Treatment Measures;
小湾拱坝坝肩稳定及加固处理措施研究
4.
The Research on Xiao Wan High Arch Dam s Abutment Stability and Complex Geological Flaw s Generalized Simulation;
小湾高拱坝坝肩稳定分析及复杂地质缺陷概化模拟研究
5.
Summary of Reinforcement Treatment of Abutment Rock Body in Xiaowan Hydropower Station
小湾水电站坝肩抗力岩体地质缺陷加固处理管理概述
6.
Meshless Method on Seepage in Fractured Rock Mass in Xiaowan Dam Site with 3D Network Computational Simulating Technique for Random Discontinuous;
小湾水电站坝肩岩体裂隙网络渗流的三维网络与无网格法耦合模型研究
7.
Research of Mechanical Properties and Response to Project of Xiaowan Hydropower Station Abutment Altered Rock under the High-pressure Seepage;
小湾水电站坝肩蚀变岩高压渗流条件下的力学特性及工程响应研究
8.
Slotted shoulder head screw with adjustable shoulder and thread sizes.
肩和螺纹大小可调整的带肩一字槽螺钉。
9.
The Investigate of Measurement Method in Berm After Double-curvature Arch Dam of XiaoWan
小湾双曲拱坝坝后马道测量方法探讨
10.
The Geological Evaluation of the Rock Mass Engineering after the Excavation of the Spandrel Trough between the Banks of Xi Luo Du Hydropower Station;
溪洛渡水电站高拱坝两岸拱肩槽开挖后岩体工程地质评价
11.
Finite element analysis of foundation unloading and relaxation effects of Xiaowan Arch Dam
小湾拱坝坝基开挖卸荷松弛效应的有限元分析
12.
Study on the Properties of Concrete for Arch Dam of Xiaowan Hydropower Station
小湾水电站双曲拱坝混凝土性能研究
13.
Dynamic tracking simulation analysis of temperature field of Xiaowan Arch Dam during construction period
小湾拱坝施工期温度场动态跟踪仿真
14.
Analysis of Initial Stress Field Regression and Excavating Abutment High Slope Using Three-dimensional Nonlinear Finite Element Method on Jinping;
锦屏水电站地应力场回归分析与坝肩槽开挖高边坡稳定性三维非线性有限元分析
15.
Study on Dam Stress Determination Based on Adaptive FEM and Plane FEM Stability Analysis for Xiaowan;
自适应有限元大坝应力取值研究及小湾拱坝平面稳定分析
16.
RESEARCH ON UNLOADING AND ZONATION OF ROCK MASS DAM FOUNDATION EXCAVATION-A CASE STUDY OF XIAOWAN HYDROPOWER STATION
坝基岩体开挖卸荷与分带研究——以小湾水电站坝基岩体开挖为例
17.
Study on Shear Strength of the Interfact between the Xiaowan Arch Dam Body Concrete and the Foundation Rock
小湾坝体混凝土与基岩接触面抗剪强度研究
18.
Application Spatial Variations in Slope of Deposit Body Located in Front of Xiao Wan Dam on Left;
小湾左岸坝前堆积体边坡的空间变异性研究