说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 云南水电
1.
Discussions on the combination of reservoir resettlements with poverty alleviation plan in the development of hydropower projects in Yunnan;
云南水电工程移民与扶贫计划相结合的探讨
2.
The Regional Potentiality Assessment System of Yunan Hydropower CDM Project Based on GIS
基于GIS的云南水电CDM项目区域潜力评价系统
3.
Research of Coordinated Optimization Control Strategy of Hydro-Thermal AGC Generators in Yunnan Power Grid
云南电网水火电AGC机组协调优化控制策略研究
4.
Hydro-thermal AGC Generators Coordinated Optimization Control Strategy in Yunnan Power Grid
云南电网水火电机组AGC协调优化控制策略
5.
Back Calculation and Distribution Features Study of Ground Stress Field for Hydropower Project in Yunnan
云南某水电站地应力场反演及其分布规律研究
6.
Simulation study on destruction mechanism of Workshop Slop about somewhere hydropower station in YunNan province
云南某水电站厂房边坡破坏机理模拟研究
7.
Immigrants and Ecological Compensation in Hydropower Development of the Lancang River--The Case of Manwan Hydropower Station in Yunnan Province;
澜沧江水电开发移民与生态补偿——以云南漫湾水电站为例
8.
Expediting Nuozhadu Hydropower Station Boosting Yunnan Province as the Main Hydroenergy Sources Base of China;
加快糯扎渡水电站建设 把云南省建设成全国重要的水电能源基地
9.
The Development of Hydro-power Stations and its Potential Influence on the Hydrologic Traits and Water Resources in Yunnan Province
水电开发及其对水文水资源特性的潜在影响——以云南省为例
10.
The important role of Xiaowan Hydropower Station in the power transmission from west to east and the development of economy in Yunnan Province;
小湾水电站在云南“西电东送”和经济发展中的作用
11.
Yunnan Nationalities Film Studio
云南民族电影制片厂
12.
ANALYSIS ON YUNNAN SEVERE PRECIPITATION AROUSED BY CONVECTIVE CLOUD CLUSTERS OVER THE BAY OF BENGAL DURING EARLY SUMMER
孟加拉湾云团影响下云南强降水分析
13.
Strategic Plan and Study on Project Management of Dimaluohe Hydropower Station;
云南贡山迪麻洛河水电站工程项目建设管理策划研究
14.
Analysis of the Effects of Hydropower Development on the Tourism Development in the Fragile Ecological Area;
水电开发对生态脆弱区旅游发展影响分析——以云南怒江为例
15.
The security of land resources demand for relocated land-losing farmers in Western China s hydroelectric development:a case study in Yunnan province;
我国西部水电移民安置的土地资源需求与保障研究——以云南省为例
16.
The Principles Land Use Planning for Setting Migrants Arose from Building Hydropower Station at the Provincial Level and its Practice in Yunnan Province;
省级水电移民安置用地规划原理及其在云南的实践
17.
The Stability Research of Jiuzi Collapse Accumulation Wanjiakouzi Hydropower Station in Yunnan Province
云南万家口子水电站九子崩滑堆积体稳定性研究
18.
A Study of the Environmental Capacity Evaluation for the Reservoir-related Resettlement:A Case Study of the Resettlement for Nuozhadu Hydro-station in Yunnan Province
水库移民安置区的环境容量评价研究——以云南省糯札渡水电站水库移民安置区为例