1.
Empirical Study of Risk-sharing Mechanism in Large-scale Petrochemical EPC Turnkey Projects
大型石油化工EPC交钥匙项目风险分担机制实证研究
2.
Design Management by Owner for International EPC/Turnkey Project;
国际EPC交钥匙合同业主方的设计管理
3.
Contractor s Risk Management under Conditions of Contract for EPC/Turnkey Project;
EPC/交钥匙合同条件下的承包商风险管理
4.
The Research and Application of Turn-key Management Model in Thermal Power Project;
火电项目交钥匙管理模式研究及其应用
5.
ANALYSIS OF DEPENDENCE ON LOCAL RESOURCE IN THE PROCESS OF EPC & TURN-KEY PROJECT
EPC/交钥匙工程实施过程中对当地资源依赖性的分析
6.
This system can also be called product line/key-delivered project/factory (hereinafter the term tender item will be used as the general designation).
该系统也可称为生产线/交钥匙工程/工厂(以下统称为“招标项目”)。
7.
Please keep TRIO in mind for any partial or complete turnkey system that you might have for a mine, quarry or sand and gravel operation.
在矿山、石场和砂石场项目运作时,记住TRIO公司的交钥匙成套系统设备。
8.
We offer support via turnkey projects, participation in customer projects and / or delivering of specialists.
我们的支持方式包括:交钥匙工程、直接参与客户的项目、为客户提供专业技术人员。
9.
I'll leave the keys in your keeping.
我把钥匙交你保管.
10.
Lectures on modern EPC project management Part 2: Quotation and kick-off of modern EPC project;
现代EPC工程项目管理讲座 第二讲:EPC工程项目报价和项目启动
11.
Lecture on Management of Modern EPC Engineering ProjectThe Second Lecture: Proposal and Start of EPC Engineering Project;
现代EPC工程项目管理讲座 第二讲:EPC工程项目报价和项目启动
12.
Analysis on contract condition of EPC project and FIDIC project
浅析EPC项目与FIDIC项目的合同条件
13.
TOTAL AMOUNT ON TURN-KEY BASIS.
按照交钥匙基础交厂房,费用总额多少?
14.
Lectures on modern EPC project management Part 3: Key points on management of general contacting of EPC project;
现代EPC工程项目管理讲座 第三讲:EPC工程总承包项目管理要点
15.
Lectures on modern EPC project management Part 1: Concepts in modern EPC project management;
现代EPC工程项目管理讲座 第一讲:现代EPC工程项目管理概念
16.
Lecture on Management of Modern EPC Engineering Project The Third Lecture:Key Points of EPC Contract Project Management;
现代EPC工程项目管理讲座 第三讲:EPC工程总承包项目管理要点
17.
The Target Cost Management s Discussion on EPC General Contract Project;
EPC总承包项目目标成本管理探讨
18.
It is very important that you always keep the key with you, and that you return it to the guards' office on your departure date.
注意随身携带钥匙,并在培训结束后离开时将钥匙交还给保卫室。