说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 东深工程
1.
Dongjiang--Shenzhen Water Supply Works Water Price Estimation Sub-group
东深工程对港供水水价测算小组
2.
Dongshen--Hong Kong Water Supply Scheme
东深─香港供水工程
3.
Dongjiang--Shenzhen Water Supply Engineering Administration Bureau
东深供水工程管理局
4.
Surface Source Pollution Control in the Dongjiang--Shenzhen Water Supply Scheme
东深供水工程面污染源管理工作制度
5.
Report Form on the Progress of Works to Improve Water Quality along the Dongshen Basin
东深流域水质处理工程进度表
6.
Numeration and On-site Testing for the Water Transition Process of DongShen Water Supply System;
东深供水工程水力过渡过程计算与测试研究
7.
The Dispatcher Management Application Study of Dongjiang Water Source Project of Shenzhen;
深圳东江水源工程调度管理的应用研究
8.
Underground Support Structure Design for Nanshan Part of C-Ⅳ of Dongsheng Water Supply Engineering;
东深供水工程C-Ⅳ标南山段地下支护结构设计
9.
Design of Advanced Wastewater Treatment and Reuse Project in Shijiazhuang Qiaodong;
石家庄桥东污水深度处理回用工程设计
10.
Measure and payment for civil engineering items of Dongjiang-Shenzhen Water Supply Reconstruction Project;
东深供水改造工程土建项目的计量与支付
11.
Study on Hydraulic Transients Calculation for Qiling Pump Station of Dongshen Watersupply Project;
东深供水工程旗岭泵站引水工程水力过渡计算研究
12.
Analysis of Stability and Integrated Studying of Reinforcing about the Shitouling Slope in the Water Supply Reconstruction Project from Dongjiang to Shenzhen;
东深供水改造工程石头岭滑坡稳定性分析与加固综合研究
13.
Implementing Green Project Advocating Green Civilization--Profound Transformation of Green Revolution Practice in Dongfang City;
实施绿色工程 倡导绿色文明——东方市绿色革命实践的深刻变革
14.
Composite Bracing of Anchor Rods with Soil Employment of in the Foundations in Guangdong Changcheng Construction Corp for Housing Engineering;
复合土钉支护在广东长城建设集团安居楼工程深基坑中的应用
15.
Study on Control Strategy of Flow Regulation Timing for Dongsheng Water Supply Project
东深供水工程泵站加减流量时间点的控制策略研究
16.
"There is something about it that strikes them deeply," said Michael Mannion, author of Project Mindshift.
《思维转换工程》的作者迈克尔-曼尼恩说:"金光现象中的某些东西深深地吸引着人们。
17.
Site 782A (ODP,Leg125)lies on the eastern margin of the Izu Bonin forearc basin,about halfway between the active volcanic arc and the Izu Bonin trench in the western Pacific Ocean. The borehole 782A,476 8 m deep,was fully cored and described.
大洋钻探工程”125航次的782A钻孔位于西太平洋菲律宾海东北部,井深476.8m。
18.
Construction of the Yangshan Deepwater Seaport( Phase1), including the port area, Donghai Bridge and the New Harbor City, progressed rapidly as scheduled.
洋山深水港区一期工程加快推进,港区,东海大桥和临港新城建设完成了节点目标。