1.
Research of Construction Control for Prestressed Concrete Continuous Beam Bridge;
预应力混凝土连续梁桥施工控制研究
2.
Study on Construction Control of Cantilever Erection Continuous Curved Girder Bridge;
悬臂拼装曲线连续梁桥施工控制研究
3.
Construction Controlling and Simulation of Continuous Bridge with ANSYS;
连续梁桥施工控制与ANSYS仿真分析
4.
Construction Monitor of Taolaizhao Songhuajiang rigid-Continuous Bridge;
陶赖昭松花江刚构—连续梁桥施工控制
5.
Construction Control of PC Continuous Beam Bridge and Analysis of Closure Parameter
PC连续梁桥施工控制与合龙参数分析
6.
On construction control of continuous prestressed concrete bridge
浅议预应力混凝土连续梁桥施工控制
7.
Study on Construction Control of the Multi-Span Continuous PC Girder Bridge with Dissymmetry Construction;
多跨不对称施工PC连续梁桥施工控制研究
8.
The Application of Artifical Neural Network in the Construction Control of the Continuous Beam Bridge;
人工神经网络在连续梁桥施工控制中的应用
9.
Monitoring of a Certain Continuous Girder Bridge of Reconstruction-Extension Engineering at G204 Section
G204如皋段改扩建工程某连续梁桥施工监控
10.
Research on Construction Monitoring and Control of Prestressed Concrete Continuous Bridge;
预应力混凝土连续梁桥施工监测与控制的研究
11.
Technology and Application of Construction Control in Prestressed Concrete Continuous Beam Bridge;
预应力混凝土连续梁桥施工控制技术与应用
12.
The continuous bridge after simply supported is the building type adopted in current bridge construction.
先简支后连续桥梁是现在桥梁施工采用的形式。
13.
The Structure Design, Construction Technology of Continuous Rigid-Frame Beam Bridges
连续—刚构连续体系梁桥结构设计及施工工艺
14.
Construction Monitor of Large Span Continuous Box Girder;
大跨度连续箱梁桥施工监控技术研究
15.
On Multipoints Jacking Construction of Zhujiang Bridge with 5 × 50 m Continuous Box Girder
珠江大桥5×50m连续箱梁多点顶推施工
16.
Cantilever constructional requirements and controlling methods of continuing bridge
连续梁桥的悬臂施工要求和控制方法
17.
Construction Techniques for Segment No.0 of the Continuous Girder of the Wujiawan Mega Bridge
吴家湾特大桥连续梁0~#块施工技术
18.
Discussion on the construction control of large span continuous steel bridge
浅谈大跨度连续刚构桥梁的施工控制