说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 丹江口
1.
Analysis of the Operating Behavior of Concrete Dam of the Danjiangkou Hydro-junction
丹江口水利枢纽砼大坝工作性态分析
2.
Epidemiology investigation on mental disorder in Dan jiangkou city in 1998
丹江口市1998年精神病流行学调查报告
3.
Analysis on the Deformation Monitoring of Left-bank Earth Rockfill Dam of Danjiangkou Project;
丹江口左岸土石坝变形监测资料分析
4.
Research on the Paleolithic Site at Maojiawa in Danjiangkou City,Hubei;
湖北丹江口市毛家洼旧石器遗址调查
5.
Study on the Non-Point Pollution of Small Watershed in Danjiangkou Reservior Area
丹江口库区小流域面源污染特征研究
6.
Analysis for Danjiangkou dam foundation uplift pressure statistical model
丹江口大坝坝基扬压力统计模型分析
7.
RAINFALL EROSIVITY IN THE DANJIANGKOU RESERVOIR REGION,HUBEI PROVINCE
湖北丹江口水库库区降雨侵蚀力特征
8.
Seepage Characteristics of Danjiangkou Water Control Project Dam Foundation
丹江口水利枢纽大坝地基的渗流特性
9.
A Preliminary Report on the Excavation of the Beitaishanmiao Paleolithic Site at Danjiangkou,South China
丹江口北泰山庙旧石器遗址发掘简报
10.
Modal Marker "得[te]" in Danjiangkou Dialect
湖北丹江口方言的情态标记“得[te]”
11.
Remake of stator core of generator No.5 of Danjiangkou Hydropower Plant
丹江口电厂5号发电机定子铁芯改造
12.
IMPACT OF THE DANJIANGKOU RESERVOIR ON THE FLOW REGIME IN THE MIDDLE AND LOWER REACHES OF HANJIANG RIVER
丹江口水库对汉江中下游径流特性的影响
13.
ECOLOGICAL IMPACT S OF THE DANJIANGKOU RESERVOIR ON THE MIDDLE AND LOWER REACHES OF THE HAN RIVER
丹江口水库对汉江中下游影响的生态学分析
14.
COMMUNITY STRUCTURE OF THE INTESTINAL HELMINTHS OF THE CHINESE HOOKSNOUT CARP,OPSARIICHTHYS BIDENS(GNTHER),FROM THE DANJANGKOU RESERVIOR
丹江口水库马口鱼肠道寄生蠕虫群落结构
15.
Study on the Ecological Safety under the Industrial Development in Danjiangkou Reservoir Areas--A Case Study of the Danjiangkou Reservoir Area in Xichuan County of Henan Province;
丹江口库区产业发展条件下的生态安全研究——以河南省淅川县辖丹江口水库库区为例
16.
Study on Status and Spatial Variability of Soil Nutrients in the Danjiangkou Reservoir Region--A Case Study in A Small Watershed in Danjiangkou City
丹江口库区土壤养分状况及空间变异性研究——以丹江口市小茯苓村小流域为例
17.
The Calculation and Analysis of Deflection for Danjiangkou Concrete Dam(from Block No.30 to No.44)
丹江口混凝土坝30至44坝段位移的计算与分析
18.
Deformation indices monitoring a dam section of Danjiangkou project
丹江口大坝31号坝段变形监控标的探讨