1.
Closed-type Management & Vehicle Auto-distinguishing System at Construction Site of Shuibuya Hydro-project;
清江水布垭工区封闭管理和车辆自动识别系统
2.
Practice of Involvement of Owner in Reservoir Resettlement of Shuibuya Hydroelectric Project;
水布垭工程业主参与库区移民工作的实践
3.
Countermeasure for Resettlement Work of Shuibuya Hydroproject & Realization about It;
水布垭工程坝区移民问题、对策及几点认识
4.
Final archives management of Shuibuya Hydropower Project;
水布垭水电站工程竣工档案的管理工作
5.
Practice of disperse-resettlement for Shuibuya Hydropower Station;
水布垭水电站库区移民分散安置的实践
6.
STUDIES ON ENVIRONMENTAL CAPACITY OF THE SETTLEMENT AREA IN THE REGION OF SHUIBUYA RESERVOIR ON THE QINGJIANG RIVER;
清江水布垭水库农村移民安置区环境容量研究
7.
Construction Technology of Large Cross-Section Diversion Tunnel of Shuibuya Water Conservancy;
水布垭水利枢纽特大断面导流隧洞施工技术
8.
Key technology for construction of anti-scour wall by shaft method on the left bank of Shuibuya hydropower station
水布垭水电站左岸防淘墙竖井法施工关键技术
9.
Bringing Project Owner s Leading Role into Play, Building Green Environmental Shuibuya Hydroproject;
发挥业主主导作用 建设绿色环保水布垭工程
10.
New construction technology for Shuibuya Concrete Faced Rockfill Dam
水布垭高混凝土面板堆石坝施工新技术
11.
Analysis of Excavation Construction and Dynamic Response on the Shuibuya Power Station Tunnel;
水布垭电站尾水隧洞施工过程分析与爆破动力研究
12.
Leakage Evaluation of Karstic Rock Based on Stochastic Structure Model and It's Application in Shuibuya Dam;
基于随机结构模型的溶蚀岩体渗漏分析在水布垭工程中的应用
13.
Study on Construction Technology with Observational Method and FEM Anasys of Shuibuya Big Span Tunnel;
水布垭导流大跨度隧道信息化施工及有限元数值分析
14.
A Feasibility Study of Hubei Qingjiang Shui Bu Ya Hydro-hinge;
湖北清江水布垭水利枢纽可行性研究
15.
Failure Mechanism of Muzhuping Landslide in Shuibuya Reservoir Area,Qingjiang River
清江水布垭库岸木竹坪滑坡失稳探讨
16.
Overflow Cofferdam and Diversion Scheme Study for Qingjiang Shuibuya Hydropower Project;
清江水布垭水电站过水围堰及度汛方案研究
17.
Shuibuya Hydropower Project is the first step of cascade development on Qingjiang River . The project is located across the border between BaDong county EnShi State and ChangYang County of YiChang City.
水布垭枢纽工程是清江梯级开发的龙头电站,工程占地跨恩施州巴东县和宜昌市长阳县两县。
18.
Intelligent optimization analysis of excavation and support sequence of tailrace tunnel for Shuibuya Project
水布垭尾水洞开挖与支护顺序的智能优化分析